maintain(deps): bump golang.org/x/net from 0.11.0 to 0.20.0 #2515
Annotations
4 errors
go-test (postgres 12)
Process completed with exit code 1.
|
go-test (postgres 14)
The job was canceled because "_12" failed.
|
go-test (postgres 14)
Process completed with exit code 1.
|
test
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
build-log
Expired
|
1.03 MB |
|