Skip to content

ci: upgrade tests matrix #52

ci: upgrade tests matrix

ci: upgrade tests matrix #52

Triggered via pull request March 4, 2024 13:02
Status Failure
Total duration 50s
Artifacts

tests.yml

on: pull_request
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Tests (3.12)
Process completed with exit code 1.
Tests (3.10)
The job was canceled because "_3_12" failed.
Tests (3.10)
The operation was canceled.
Tests (3.9)
The job was canceled because "_3_12" failed.
Tests (3.9)
The operation was canceled.
Tests (3.11)
The job was canceled because "_3_12" failed.
Tests (3.11)
The operation was canceled.