Skip to content

Latest commit

 

History

History
101 lines (83 loc) · 4.6 KB

2008-07-20-a-bit-more-formalism-as-to-why-clrs-mm-is-broken-on-x86x64.md

File metadata and controls

101 lines (83 loc) · 4.6 KB
layout title date categories tags status type published meta author
post
A bit more formalism as to why CLR's MM is broken on x86/x64
2008-07-20 01:14:14 -0700
Technology
publish
post
true
_wpas_done_all
1
login email display_name first_name last_name
admin
joeduffy@acm.org
joeduffy

Here's a slightly more formal approach to demonstrating that the CLR MM is improperly implemented for the particular example I showed earlier.

As the Java MM folks have done, I will use a combination of happens-before and synchronizes-with relations, which allows order in a properly synchronized program to be describe as a "flat" sequence with total ordering among elements. Assume < means synchronizes-with. If a happens-before b, and a < b, then any writes in a are visible to any loads in b. This relation is transitive: if a < b and b < c, then a < c. Given this, we can take an observed set of results (the values held in memory locations), a hypothesized execution order (which we can infer from the observation), and validate it against the program order (as written in the source); we do this by taking the MM-specific synchronizes-with relation rules, and see if we can produce the observed output given our belief of the execution order. If we find a contradiction (the execution order required to produce the output could not be produced given the program order and MM rules), either there is an alternative execution order we failed to guess, or we have found a violation of the memory model.

Single threaded programs are easy. Multi threaded programs are hard. We must manually "sequentialize" the program by constructing an interleaving of all executed program operations into a single flat sequence, and permute them as needed to produce the output in order to formulate a hypothesis of the execution order. This is of course very difficult to do, so it only works with very small programs (like the one I will show below).

I will try to define the CLR 2.0 MM in terms of synchronizes-with, although I have to admit it's going to be difficult to do off the top of my head:

  1. a < b, given a volatile load a that precedes any other memory operation b. (Loads are acquire.)

  2. a < b, given any memory operation a that precedes any other store b. (Stores are release.)

  3. a < b, given two separate memory operations a which precedes b that work with the same memory location. (Data dependence.)

  4. a < b, given any memory operation a that precedes a full fence b. (Cannot move after a fence.)

  5. a < b, given a full fence a that precedes some memory operation b. (Cannot move before a fence.)

  6. a < b, given a lock acquire a that precedes some memory operation b. (Lock acquires are acquire fences.)

  7. a < b, given a memory operation a that precedes a lock release b. (Lock releases are release fences.)

Let's take the disturbing example, assuming all loads and stores are volatile.

X = 1;              Y = 1;
R0 = X;             R2 = Y;
R1 = Y;             R3 = X;

Let's hypothesize about execution order.

To produce an output in which R1 == R3 == 0, let us observe that it must be the case that X = 1 and Y = 1 must not happen first. If one such instruction does occur first, then any possible outcome leads to R1 and/or R3 holding the value 1. That is because of rule 3: if X = 1 happened first, then X = 1 < R3 = X, leading to R3 == 1 and similarly if Y = 1 happened first, then Y= 1 < R1 = Y, leading to R1 == 1. So let us try to make X = 1 and Y = 1 not happen first.

Indeed, it is impossible for R0 = X or R2 = Y to happen first. This is because of CLR MM rule 3: X = 1; R0 = X leads to data dependence, and thus X = 1 < R0 = X. Similarly, Y = 1 < R2 = Y. Dead end. Let's try the only other route.

The only remaining possibility to produce the output R1 == R3 == 0 is if R1 = Y or R3 = X occurs first. Let us try to make R1 = Y occur first. Ah-hah! We cannot! Given CLR MM rule 1, R0 = X < R1 = Y. And because of transitivity, this necessarily implies that X = 1 < R1 = Y. The same holds for the other thread's instructions: Y = 1 < R3 = X. The output R1 == R3 == 0 is therefore a contradiction and disallowed by the CLR MM.

Now, this is light years from a formal proof, but is the reasoning I've been using in my mind to explain why this new realization is fundamentally very disturbing and is explicitly not allowed by the CLR MM. Thankfully it seems the JIT team agrees and is willing to fix this for the next release. And, I'm still in search of an example of code that is broken by this problem ...