-
Notifications
You must be signed in to change notification settings - Fork 0
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
- Loading branch information
1 parent
6476529
commit bf4214e
Showing
1 changed file
with
59 additions
and
0 deletions.
There are no files selected for viewing
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,59 @@ | ||
# USER MANUAL | ||
|
||
## General | ||
|
||
N/A | ||
|
||
## Application Layout | ||
|
||
Biggest part of the screen layout is the actual field plan. It's a grid layout representing all the possible locations for the boreholes. The view can be zoomed with the controls provided in the "View" menu. | ||
|
||
## Application Menu | ||
|
||
### File Menu | ||
|
||
**New Plan**: (opens in a new tab) Create a new plan. | ||
|
||
**Load Plan From Save Code**: (opens a new tab) Load an old plan with an existing save code. | ||
|
||
**Configure Latency Selection**: Open the view to configure the latency selection for the active plan. | ||
|
||
**Analyze [unavailable]**: Analyze the field and create statistics. | ||
|
||
**Get Save Code**: (opens in a new tab) Generates a new save code for the current field at the moment (if work is continued, a new save code must be requested). | ||
|
||
**Print [unavailable]**: Print the field plan. | ||
|
||
**Reset Field**: Completely reset the field. | ||
|
||
**Exit**: Exit the application without saving. | ||
|
||
### Select | ||
|
||
**Tool**: Select a tool. | ||
|
||
**Bulk Replace Tool**: Activate the Bulk Replace Tool. Functionality: All connections on the field with the latency _x_ are replaced with the latency _y_. | ||
|
||
**Toggle Borehole Linking**: Toggle the Borehole Linking on and off. When _on_, connections may be done in a chain-like fashion, where the latest borehole is remembered and a new connection creation is instantly started. When _off_, each connection must be created by always first clicking the starting node and then the finishing node. | ||
|
||
**Clear Tool Selection**: Reset the Tool selection to "cursor". | ||
|
||
**Clear Borehole Selection**: Reset the Borehole selection to "null". | ||
|
||
### View | ||
|
||
**Zoom In**: Increase the Zoom level by 1. | ||
|
||
**Zoom Out**: Decrease the Zoom level by 1., | ||
|
||
**Zoom Minimum**: Zoom as far out as possible. | ||
|
||
**Zoom Maximum**: Zoom as close in as possible. | ||
|
||
**Reset Zoom**: Reset the Zoom level to default. | ||
|
||
**Toggle Fullscreen**: Enable and disable the Fullscreen mode, also achieved with key F11. | ||
|
||
### Debug | ||
|
||
**Log state arrays to console**: Log the _field_, _fieldStatus_, and _fieldValues_ matrices into the web console. Open console with F12. |