Skip to content

Switch to Ruff as the primary lint tool #367

Switch to Ruff as the primary lint tool

Switch to Ruff as the primary lint tool #367

Triggered via pull request January 7, 2024 00:40
@jparisejparise
opened #147
ruff
Status Failure
Total duration 43s
Artifacts

ci.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

15 errors
Ruff (E402): docs/conf.py#L7
docs/conf.py:7:1: E402 Module level import not at top of file
build (3.9)
Process completed with exit code 1.
build (3.8)
The job was canceled because "_3_9" failed.
Ruff (E402): docs/conf.py#L7
docs/conf.py:7:1: E402 Module level import not at top of file
build (3.8)
Process completed with exit code 1.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
The operation was canceled.
build (3.11)
The job was canceled because "_3_9" failed.
build (3.11)
The operation was canceled.
build (pypy-3.8)
The job was canceled because "_3_9" failed.
build (pypy-3.8)
The operation was canceled.
build (pypy-3.9)
The job was canceled because "_3_9" failed.
build (pypy-3.9)
The operation was canceled.
build (3.12)
The job was canceled because "_3_9" failed.
build (3.12)
The operation was canceled.