Skip to content

Suggestion volume resumePolicy override #206

Suggestion volume resumePolicy override

Suggestion volume resumePolicy override #206

Triggered via pull request June 5, 2023 05:41
@a9pa9p
synchronize #1992
a9p:reconcile
Status Cancelled
Total duration 8m 6s
Artifacts

e2e-test-enas-cifar10.yaml

on: pull_request
Matrix: e2e
Fit to window
Zoom out
Zoom in

Annotations

6 errors
e2e (v1.24.7, enas-cpu)
Canceling since a higher priority waiting request for 'E2E Test with enas-cnn-cifar10-refs/pull/1992/merge' exists
e2e (v1.24.7, enas-cpu)
The operation was canceled.
e2e (v1.23.13, enas-cpu)
Canceling since a higher priority waiting request for 'E2E Test with enas-cnn-cifar10-refs/pull/1992/merge' exists
e2e (v1.23.13, enas-cpu)
The operation was canceled.
e2e (v1.25.3, enas-cpu)
Canceling since a higher priority waiting request for 'E2E Test with enas-cnn-cifar10-refs/pull/1992/merge' exists
e2e (v1.25.3, enas-cpu)
The operation was canceled.