Update dependency sinon to v15.0.4 #2603
ci.yml
on: pull_request
Tests
58s
Floating Dependencies
59s
Matrix: try-scenarios
Annotations
7 errors
ember-beta
Process completed with exit code 1.
|
ember-release
Process completed with exit code 1.
|
ember-canary
Process completed with exit code 1.
|
ember-lts-3.8
The job running on runner GitHub Actions 58 has exceeded the maximum execution time of 360 minutes.
|
ember-lts-3.8
The operation was canceled.
|
ember-lts-3.12
The job running on runner GitHub Actions 28 has exceeded the maximum execution time of 360 minutes.
|
ember-lts-3.12
The operation was canceled.
|