-
Notifications
You must be signed in to change notification settings - Fork 26
/
ChangeLog
30 lines (22 loc) · 1.01 KB
/
ChangeLog
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
# ChangeLog for dev-ruby/icalendar
# Copyright 1999-2012 Gentoo Foundation; Distributed under the GPL v2
# $Header: $
30 Apr 2012; Vadim A. Misbakh-Soloviov <mva@mva.name>
icalendar-1.1.4.ebuild, icalendar-1.1.5.ebuild, metadata.xml:
BUMP! (sorry for bunch-commit again. I still save no time to clean overlay
and then do little one-feature commits)
Signed-off-by: Vadim A. Misbakh-Soloviov <mva@mva.name>
22 Jan 2012; Vadim A. Misbakh-Soloviev <mva@mva.name>
icalendar-1.1.4.ebuild, icalendar-1.1.5.ebuild, metadata.xml:
repoman related
22 Jan 2012; Vadim A. Misbakh-Soloviev <mva@mva.name>
icalendar-1.1.4.ebuild, icalendar-1.1.5.ebuild, metadata.xml:
Mass Pulling. Sorry.
16 Jul 2011; Misbakh-Soloviev Vadim A. (mva) <mva@mva.name>
icalendar-1.1.4.ebuild, icalendar-1.1.5.ebuild:
some fixes
*icalendar-1.1.5 (11 May 2011)
*icalendar-1.1.4 (11 May 2011)
11 May 2011; Misbakh-Soloviev Vadim A. (mva) <mva@mva.name>
+icalendar-1.1.4.ebuild, +icalendar-1.1.5.ebuild, +metadata.xml:
added some crap.