Skip to content

Switched pipeline from master to main branch #1

Switched pipeline from master to main branch

Switched pipeline from master to main branch #1

Triggered via push October 11, 2023 05:12
Status Failure
Total duration 42s
Artifacts

pipeline.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 2 warnings
test (18.x)
The process '/home/runner/work/jewire/jewire/cc-reporter' failed with exit code 255
test (18.x)
🚨 CC Reporter coverage upload failed!
test (16.x)
The operation was canceled.
test (18.x)
The following actions uses node12 which is deprecated and will be forced to run on node16: actions/checkout@v2, actions/setup-node@v2. For more info: https://github.blog/changelog/2023-06-13-github-actions-all-actions-will-run-on-node16-instead-of-node12-by-default/
test (16.x)
The following actions uses node12 which is deprecated and will be forced to run on node16: actions/checkout@v2, actions/setup-node@v2. For more info: https://github.blog/changelog/2023-06-13-github-actions-all-actions-will-run-on-node16-instead-of-node12-by-default/