Skip to content

Bump gopkg.in/yaml.v3 from 3.0.0-20200313102051-9f266ea9e77c to 3.0.0 #1084

Bump gopkg.in/yaml.v3 from 3.0.0-20200313102051-9f266ea9e77c to 3.0.0

Bump gopkg.in/yaml.v3 from 3.0.0-20200313102051-9f266ea9e77c to 3.0.0 #1084

Triggered via pull request August 30, 2023 13:59
Status Failure
Total duration 43s
Artifacts

go.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (1.19.x)
Process completed with exit code 2.
test (1.18.x)
The job was canceled because "_1_19_x" failed.
test (1.18.x)
Process completed with exit code 2.
test (1.17.x)
The job was canceled because "_1_19_x" failed.
test (1.17.x)
The operation was canceled.