chore(deps): update dependency prism-svelte to ^0.5.0 #228
Annotations
11 errors
test-and-coverage
Process completed with exit code 1.
|
test (16.x)
Process completed with exit code 1.
|
test (14.x)
The job was canceled because "_16_x" failed.
|
test (14.x)
The operation was canceled.
|
test-for-vite-v2 (18.x)
Process completed with exit code 1.
|
test (18.x)
The job was canceled because "_16_x" failed.
|
test (18.x)
The operation was canceled.
|
test (12.x)
The job was canceled because "_16_x" failed.
|
test (12.x)
The operation was canceled.
|
test (17.x)
The job was canceled because "_16_x" failed.
|
test (17.x)
The operation was canceled.
|