Skip to content

up go 1.22.3

up go 1.22.3 #240

Triggered via push May 16, 2024 10:29
Status Cancelled
Total duration 4m 34s
Artifacts

verify-build.yml

on: push
Matrix: Integration Tests
Fit to window
Zoom out
Zoom in

Annotations

21 errors
PFI Tests1
Process completed with exit code 1.
Integration Tests (pvtdatapurge)
The run was canceled by @pfi79.
Integration Tests (pvtdatapurge)
The operation was canceled.
Integration Tests (lifecycle)
The run was canceled by @pfi79.
Integration Tests (lifecycle)
The operation was canceled.
Integration Tests (raft)
The run was canceled by @pfi79.
Integration Tests (raft)
The operation was canceled.
Integration Tests (e2e smartbft)
The run was canceled by @pfi79.
Integration Tests (e2e smartbft)
The operation was canceled.
Unit Tests
The run was canceled by @pfi79.
Integration Tests (sbe nwo msp)
The run was canceled by @pfi79.
Unit Tests
The operation was canceled.
Integration Tests (sbe nwo msp)
The operation was canceled.
Integration Tests (discovery gossip devmode pluggable)
The run was canceled by @pfi79.
Integration Tests (discovery gossip devmode pluggable)
The operation was canceled.
Integration Tests (ledger)
The run was canceled by @pfi79.
Integration Tests (ledger)
The operation was canceled.
Integration Tests (gateway idemix pkcs11 configtx configtxlator)
The operation was canceled.
Integration Tests (pvtdata)
The run was canceled by @pfi79.
Integration Tests (pvtdata)
The operation was canceled.