Skip to content

chore: playground

chore: playground #3

Triggered via push August 18, 2023 16:50
Status Failure
Total duration 34s
Artifacts

ci.yml

on: push
Matrix: prepare
Matrix: size
Matrix: suite
Matrix: types
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Prepare (ubuntu-latest, Node 14)
Process completed with exit code 1.
Prepare (ubuntu-latest, Node 16)
The job was canceled because "ubuntu-latest_14" failed.
Prepare (ubuntu-latest, Node 16)
The operation was canceled.
Prepare (ubuntu-latest, Node 20)
The job was canceled because "ubuntu-latest_14" failed.
Prepare (ubuntu-latest, Node 20)
The operation was canceled.
Prepare (ubuntu-latest, Node 18)
The job was canceled because "ubuntu-latest_14" failed.
Prepare (ubuntu-latest, Node 18)
The operation was canceled.