Concerning the following actions:
SWS/BR: Show/hide volume track envelope for last adjusted send
SWS/BR: Show/hide track envelope for last adjusted send (volume/pan only)
The send of a track gets deleted when the previous track's corresponding send has the above action applied.
Under this condition:
Preferences > Automation > When adding volume/pan envelopes, apply trim to envelope and reset trim: Never or In read/write.
"Always" setting is ok.
Tested with a portable install, default config.
See screen capture.
https://drive.google.com/open?id=1JDLfRfIMCYgmTjkw0EhNBLCC1_zP7-o8
Thanks!
Concerning the following actions:
SWS/BR: Show/hide volume track envelope for last adjusted send
SWS/BR: Show/hide track envelope for last adjusted send (volume/pan only)
The send of a track gets deleted when the previous track's corresponding send has the above action applied.
Under this condition:
Preferences > Automation > When adding volume/pan envelopes, apply trim to envelope and reset trim: Never or In read/write.
"Always" setting is ok.
Tested with a portable install, default config.
See screen capture.
https://drive.google.com/open?id=1JDLfRfIMCYgmTjkw0EhNBLCC1_zP7-o8
Thanks!