Skip to content

Added integration test for ators #55

Added integration test for ators

Added integration test for ators #55

Triggered via push April 27, 2023 02:09
Status Failure
Total duration 1m 22s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci.yml

on: push
formatting
10s
formatting
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (ubuntu-latest, stable)
Process completed with exit code 101.
build (macos-latest, stable)
The job was canceled because "ubuntu-latest_stable" failed.
build (macos-latest, stable)
The operation was canceled.
build (ubuntu-latest, nightly)
The job was canceled because "ubuntu-latest_stable" failed.
build (ubuntu-latest, nightly)
The operation was canceled.
build (macos-latest, nightly)
The job was canceled because "ubuntu-latest_stable" failed.
build (macos-latest, nightly)
The operation was canceled.