Skip to content

Merge pull request #726 from rswag/dependabot/github_actions/actions/… #503

Merge pull request #726 from rswag/dependabot/github_actions/actions/…

Merge pull request #726 from rswag/dependabot/github_actions/actions/… #503

Triggered via push January 24, 2024 06:24
Status Failure
Total duration 1m 33s
Artifacts

ruby.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (2.6, 6.1.4.4)
Process completed with exit code 1.
test (2.7, 5.2.6)
The job was canceled because "_2_6_6_1_4_4" failed.
test (2.7, 5.2.6)
Process completed with exit code 1.
test (2.7, 7.0.1)
The job was canceled because "_2_6_6_1_4_4" failed.
test (2.7, 7.0.1)
The operation was canceled.
test (2.7, 7.0.1)
Process completed with exit code 1.
test (2.7, 6.1.4.4)
The job was canceled because "_2_6_6_1_4_4" failed.
test (2.7, 6.1.4.4)
The operation was canceled.
test (2.6, 5.2.6)
The job was canceled because "_2_6_6_1_4_4" failed.
test (2.6, 5.2.6)
The operation was canceled.
test (2.6, 5.2.6)
Process completed with exit code 1.