Skip to content

CI: build through cabal on the latest GHC #19

CI: build through cabal on the latest GHC

CI: build through cabal on the latest GHC #19

Triggered via push July 6, 2023 13:09
Status Failure
Total duration 6m 57s
Artifacts

build.yml

on: push
test-with-stack
4m 44s
test-with-stack
Matrix: test-with-ghc
Fit to window
Zoom out
Zoom in

Annotations

15 errors
test-with-ghc (7.10)
Process completed with exit code 2.
test-with-ghc (9.4)
The job was canceled because "_7_10" failed.
test-with-ghc (9.0)
The job was canceled because "_7_10" failed.
test-with-ghc (9.2)
The job was canceled because "_7_10" failed.
test-with-ghc (8.8)
The job was canceled because "_7_10" failed.
test-with-ghc (8.0)
The job was canceled because "_7_10" failed.
test-with-ghc (8.0)
Process completed with exit code 100.
test-with-ghc (8.2)
The job was canceled because "_7_10" failed.
test-with-ghc (8.2)
The operation was canceled.
test-with-ghc (8.4)
The job was canceled because "_7_10" failed.
test-with-ghc (8.4)
The operation was canceled.
test-with-ghc (8.10)
The job was canceled because "_7_10" failed.
test-with-ghc (8.10)
The operation was canceled.
test-with-ghc (8.6)
The job was canceled because "_7_10" failed.
test-with-ghc (8.6)
The operation was canceled.