[WIP][DNM] Switch to GitHub Actions #5071

Closed
wants to merge 19 commits into from
Closed

Conversation

flip1995
Copy link
Member

@flip1995 flip1995 commented Jan 20, 2020

cc #4577

This is just an experiment. I don't think we have a consensus if we should move away from travis/appveyor.

GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently. Also IIUC we only have to build Clippy once for every initegration test and then only check the repos. Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

  • Add DEPLOY_KEY secret to github repo
  • test deployment on test branch gh-test
  • talk with @rust-lang/infra for bors
  • Add GHA badge to Cargo.toml (blocked on Support GitHub Actions Badges crates.io#1838)
  • Add back travis + appveyor files for transition period (?)

changelog: none

@flip1995 flip1995 added S-needs-discussion Status: Needs further discussion before merging or work can be started S-waiting-on-author Status: This is awaiting some action from the author. (Use `@rustbot ready` to update this status) labels Jan 20, 2020
@flip1995
Copy link
Member Author

@bors try

@bors
Copy link
Collaborator

bors commented Jan 20, 2020

⌛ Trying commit 4a261de with merge 887982f...

bors added a commit that referenced this pull request Jan 20, 2020
[WIP][DNM] Switch to GitHub Actions (maybe?)

cc #4577

This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.

changelog: none
@flip1995
Copy link
Member Author

^ This should run integration tests through GHA.

@flip1995
Copy link
Member Author

@bors try

bors added a commit that referenced this pull request Jan 20, 2020
[WIP][DNM] Switch to GitHub Actions (maybe?)

cc #4577

This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.

GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently. Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.

changelog: none
@bors
Copy link
Collaborator

bors commented Jan 20, 2020

⌛ Trying commit 16b3e3c with merge 673554f...

@flip1995
Copy link
Member Author

@bors try

bors added a commit that referenced this pull request Jan 20, 2020
[WIP][DNM] Switch to GitHub Actions (maybe?)

cc #4577

This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.

GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently. Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.

changelog: none
@bors
Copy link
Collaborator

bors commented Jan 20, 2020

⌛ Trying commit e6ecefb with merge 9619877...

@flip1995
Copy link
Member Author

@bors try

bors added a commit that referenced this pull request Jan 20, 2020
[WIP][DNM] Switch to GitHub Actions (maybe?)

cc #4577

This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.

GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently. Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.

changelog: none
@bors
Copy link
Collaborator

bors commented Jan 20, 2020

⌛ Trying commit b767c40 with merge 870af4a...

@flip1995
Copy link
Member Author

@bors try

@bors
Copy link
Collaborator

bors commented Jan 20, 2020

⌛ Trying commit 0db62fa with merge 542dc23...

bors added a commit that referenced this pull request Jan 20, 2020
[WIP][DNM] Switch to GitHub Actions (maybe?)

cc #4577

This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.

GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently. Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.

changelog: none
@flip1995
Copy link
Member Author

@bors try

bors added a commit that referenced this pull request Jan 20, 2020
[WIP][DNM] Switch to GitHub Actions (maybe?)

cc #4577

This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.

GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently. ~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

changelog: none
@bors
Copy link
Collaborator

bors commented Jan 20, 2020

⌛ Trying commit 0db62fa with merge 43fbee2...

@flip1995
Copy link
Member Author

@bors try

@bors
Copy link
Collaborator

bors commented Jan 20, 2020

⌛ Trying commit 271a168 with merge 75da292...

bors added a commit that referenced this pull request Jan 20, 2020
[WIP][DNM] Switch to GitHub Actions (maybe?)

cc #4577

This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.

GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently. ~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

changelog: none
@flip1995
Copy link
Member Author

@bors try

@bors
Copy link
Collaborator

bors commented Jan 20, 2020

⌛ Trying commit 470710b with merge a5457ab...

bors added a commit that referenced this pull request Jan 20, 2020
[WIP][DNM] Switch to GitHub Actions (maybe?)

cc #4577

This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.

GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently. ~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

changelog: none
@flip1995
Copy link
Member Author

And now with cache

@bors r+

@bors
Copy link
Collaborator

bors commented Jan 20, 2020

📋 Looks like this PR is still in progress, ignoring approval.

Hint: Remove [WIP] from this PR's title when it is ready for review.

Rate limit of 60 applies org wide, let's not spam.
Thanks pietroalbini for the hint
@flip1995
Copy link
Member Author

Closing in favor of #5088

@flip1995 flip1995 closed this Jan 24, 2020
@flip1995 flip1995 deleted the gha branch January 24, 2020 13:23
bors added a commit that referenced this pull request Jan 30, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [x] ~~Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this)~~ That seems to start working again yesterday 🤔 Let's hope it keeps working.
- [ ] impl homu checks for GHA #5071 (comment)
- [ ] Add GHA badge to Cargo.toml (blocked on `rust-lang/crates.io#1838`)
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Jan 30, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [x] ~~Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this)~~ That seems to start working again yesterday 🤔 Let's hope it keeps working.
- [ ] impl homu checks for GHA #5071 (comment)
- [ ] Add GHA badge to Cargo.toml (blocked on `rust-lang/crates.io#1838`)
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Jan 30, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [x] ~~Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this)~~ That seems to start working again yesterday 🤔 Let's hope it keeps working.
- [ ] impl homu checks for GHA #5071 (comment)
- [ ] Add GHA badge to Cargo.toml (blocked on `rust-lang/crates.io#1838`)
- [ ] Add back travis + appveyor files for transition period (?)
bors added a commit that referenced this pull request Jan 30, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48
- [ ] impl homu checks for GHA #5071 (comment)
- [ ] Add GHA badge to Cargo.toml (blocked on `rust-lang/crates.io#1838`)
- [ ] Add back travis + appveyor files for transition period (?)
bors added a commit that referenced this pull request Jan 31, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable.
- [ ] impl homu checks for GHA #5071 (comment)
- [ ] Add GHA badge to Cargo.toml (blocked on `rust-lang/crates.io#1838`)
- [ ] Add back travis + appveyor files for transition period (?)
bors added a commit that referenced this pull request Jan 31, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142
- [ ] impl homu checks for GHA #5071 (comment)
- [ ] Add GHA badge to Cargo.toml (blocked on `rust-lang/crates.io#1838`)
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Jan 31, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142
- [ ] impl homu checks for GHA #5071 (comment)
- [ ] Add GHA badge to Cargo.toml (blocked on `rust-lang/crates.io#1838`)
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Jan 31, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142
- [ ] impl homu checks for GHA #5071 (comment)
- [ ] Add GHA badge to Cargo.toml (blocked on `rust-lang/crates.io#1838`)
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Jan 31, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142
- [ ] impl homu checks for GHA #5071 (comment)
- [ ] Add GHA badge to Cargo.toml (blocked on `rust-lang/crates.io#1838`)
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Jan 31, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142
- [ ] impl homu checks for GHA #5071 (comment)
- [ ] Add GHA badge to Cargo.toml (blocked on `rust-lang/crates.io#1838`)
- [ ] Maybe we should also wait until GHA supports yaml anchors. https://github.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Feb 4, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142
- [ ] impl homu checks for GHA #5071 (comment)
- [ ] Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)
- [ ] Maybe we should also wait until GHA supports yaml anchors. https://github.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Feb 4, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142
- [ ] impl homu checks for GHA #5071 (comment)
- [ ] Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)
- [ ] Maybe we should also wait until GHA supports yaml anchors. https://github.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Feb 4, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142
- [ ] impl homu checks for GHA #5071 (comment)
- [ ] Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)
- [ ] Maybe we should also wait until GHA supports yaml anchors. https://github.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Feb 4, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142
- [ ] impl homu checks for GHA #5071 (comment)
- [ ] Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)
- [ ] Maybe we should also wait until GHA supports yaml anchors. https://github.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Feb 4, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142
- [ ] impl homu checks for GHA #5071 (comment) -- I prepared: flip1995/rust-central-station@f40230d. I'd suggest to first add GHA and keep the travis and appveyor checks for a few days and to remove them in a second pass
- [ ] Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)
- [ ] Maybe we should also wait until GHA supports yaml anchors. https://github.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Feb 4, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142
- [ ] impl homu checks for GHA #5071 (comment) -- I prepared: flip1995/rust-central-station@f40230d. I'd suggest to first add GHA and keep the travis and appveyor checks for a few days and to remove them in a second pass
- [ ] Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)
- [ ] Maybe we should also wait until GHA supports yaml anchors. https://github.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Feb 4, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142
- [ ] impl homu checks for GHA #5071 (comment) -- I prepared: flip1995/rust-central-station@f40230d. I'd suggest to first add GHA and keep the travis and appveyor checks for a few days and to remove them in a second pass
- [ ] Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)
- [ ] Maybe we should also wait until GHA supports yaml anchors. https://github.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Feb 4, 2020
[WIP][DNM] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [ ] Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142
- [ ] impl homu checks for GHA #5071 (comment) -- I prepared: flip1995/rust-central-station@f40230d. I'd suggest to first add GHA and keep the travis and appveyor checks for a few days and to remove them in a second pass
- [ ] Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)
- [ ] Maybe we should also wait until GHA supports yaml anchors. https://github.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/
- [ ] Add back travis + appveyor files for transition period (?)

changelog: none
bors added a commit that referenced this pull request Feb 7, 2020
[WIP] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [x] ~~Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142~~ We need to run the bors tests unconditionally anyway (47138d1) so it doesn't really matter.
- [ ] impl homu checks for GHA #5071 (comment) -- I prepared: flip1995/rust-central-station@f40230d. I'd suggest to first add GHA and keep the travis and appveyor checks for a few days and to remove them in a second pass. The bors dummy jobs are added in 1a83b7a and work as expected: #5088 (comment). I opened rust-lang/rust-central-station#578
- [x] ~Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)~ Added a FIXME in
2332b57
- [x] ~Maybe we should also wait until GHA supports yaml anchors. https://github.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/~ WIll probably not be implemented in the near future.
- [x] Add back travis + appveyor files for transition period (!)

changelog: none
bors added a commit that referenced this pull request Feb 12, 2020
Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [x] ~~Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday. Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142~~ We need to run the bors tests unconditionally anyway (47138d1) so it doesn't really matter.
- [x] ~~impl homu checks for GHA #5071 (comment) -- I prepared: flip1995/rust-central-station@f40230d. I'd suggest to first add GHA and keep the travis and appveyor checks for a few days and to remove them in a second pass. The bors dummy jobs are added in 1a83b7a and work as expected: #5088 (comment). I opened rust-lang/rust-central-station#578 See #5088 (comment)
- [x] ~Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)~ Added a FIXME in
2332b57
- [x] ~Maybe we should also wait until GHA supports yaml anchors. https://github.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/~ WIll probably not be implemented in the near future.
- [x] Add back travis + appveyor files for transition period (!)

changelog: none
bors added a commit that referenced this pull request Feb 12, 2020
Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [x] ~~Get remark + clippy_dev check to work on pushes (https://github.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday. Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142~~ We need to run the bors tests unconditionally anyway (47138d1) so it doesn't really matter.
- [x] ~~impl homu checks for GHA #5071 (comment) -- I prepared: flip1995/rust-central-station@f40230d. I'd suggest to first add GHA and keep the travis and appveyor checks for a few days and to remove them in a second pass. The bors dummy jobs are added in 1a83b7a and work as expected: #5088 (comment). I opened rust-lang/rust-central-station#578 See #5088 (comment)
- [x] ~Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)~ Added a FIXME in
2332b57
- [x] ~Maybe we should also wait until GHA supports yaml anchors. https://github.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/~ WIll probably not be implemented in the near future.
- [x] Add back travis + appveyor files for transition period (!)

changelog: none
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
S-needs-discussion Status: Needs further discussion before merging or work can be started S-waiting-on-review Status: Awaiting review from the assignee but also interested parties
Projects
None yet
Development

Successfully merging this pull request may close these issues.

None yet

6 participants