test(integration): differentiate between integration and end-to-end tests #6546
test.yml
on: pull_request
Matrix: test_matrix
test_dev
2m 28s
test
0s
Annotations
4 errors
test_matrix (21)
Process completed with exit code 1.
|
test_matrix (20.8.1)
The job was canceled because "_21" failed.
|
test_matrix (20.8.1)
The operation was canceled.
|
test
Process completed with exit code 1.
|