yarn upgrade --latest && yarn build
(#1975)
#4774
Annotations
2 errors
flutter_build_desktop_app (macos-latest)
The job running on runner GitHub Actions 18 has exceeded the maximum execution time of 20 minutes.
|
flutter_build_desktop_app (macos-latest)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
pedax-macos-intel-silicon
|
201 MB |
|
pedax-ubuntu
|
19.4 MB |
|
pedax-windows
|
53.5 MB |
|