Skip to content

Projects -> 4 + a level of depth

Compare
Choose a tag to compare
@sowcow sowcow released this 21 Feb 19:37
· 8 commits to master since this release
  • General UI principles:
    1. RM toolbar needs to be closed
    2. squares are links except the bottom row
  • Projects PDF changed to hold only four projects.
    They are meant to be reasonably scoped to rotate the PDF often.
    Also this can be seen as a type of kanban WIP limit.
  • Instead of quantity projects got additional level of depth.
    Now inside the project there are 12 pages of lists.
    Every item in the list (except the bottom row) has additional single page inside.
  • Main page can be used for whatever creative activity logging one can come-up with.
  • I assume this structure favors decomposition.

Usage:

  • given RM toolbar is closed
  • write a project name near one square on the main page
  • enter the project square
  • 12 consecutive pages can be seen as todo lists where every item can be entered for details
    page inside it by entering the square at the left of the item
  • use back button at the top to return to the grid

COLOR_Projects