Skip to content

Releases: sowcow/blank_slate_pdf

Split-mode PDFs (L12)

23 Mar 08:37
Compare
Choose a tag to compare

v17

16 Mar 12:13
Compare
Choose a tag to compare
v17

This can be seen as advanced todo lists PDF.
It supports a type of todo items that need further decomposition because every item has 12 pages inside.
Also it supports catchall for relevant ideas/inputs that can be processed later.
Adding titles and marking used links is a good idea to navigate within the PDF.

First page (root) is a table of contents:

  • First row of links goes to 12 ideas/inputs pages.
  • Then two rows link to 12 lists pages, these links are bigger so there is space to give them name when needed.
  • Other links below link to items of lists in case that is needed at some point

Lists:

  • Lists can be accessed just by turning to the next page from the root
  • Every list has 7 items, linked by squares at the left

Items:

  • Items have 12 consecutive pages each
  • Also all pages have links to ideas/inputs pages (in the upper-right corner)

Ideas:

  • linked from every page to be very accessible for addition
  • Overall 12 pages with navigation between them at the top or by turning pages

Also title can be rendered on every page by setting title: 'ABC' in Lists.rb.
It should be useful if separate PDF file is used per project.

COLOR_Lists

Days with clock face background that asks to be filled with logs/items

23 Feb 19:26
Compare
Choose a tag to compare

Days with clock face background that asks to be filled with logs/items

Also there is a predefined background version where center square can be used as:

  • Focus of the day
  • Eisenhower matrix in four parts
  • Sketch built over the day
  • Mix of these
  • Bottom space is probably catchall/followup then (unless another tool does it)

a

Projects -> 4 + a level of depth

21 Feb 19:37
Compare
Choose a tag to compare
  • General UI principles:
    1. RM toolbar needs to be closed
    2. squares are links except the bottom row
  • Projects PDF changed to hold only four projects.
    They are meant to be reasonably scoped to rotate the PDF often.
    Also this can be seen as a type of kanban WIP limit.
  • Instead of quantity projects got additional level of depth.
    Now inside the project there are 12 pages of lists.
    Every item in the list (except the bottom row) has additional single page inside.
  • Main page can be used for whatever creative activity logging one can come-up with.
  • I assume this structure favors decomposition.

Usage:

  • given RM toolbar is closed
  • write a project name near one square on the main page
  • enter the project square
  • 12 consecutive pages can be seen as todo lists where every item can be entered for details
    page inside it by entering the square at the left of the item
  • use back button at the top to return to the grid

COLOR_Projects

added Monitors

21 Jan 10:47
Compare
Choose a tag to compare

added Index_12x12

20 Jan 17:58
Compare
Choose a tag to compare

v7

20 Jan 15:09
Compare
Choose a tag to compare
v7

COLOR_Days_MIX
COLOR_Projects_MIX
COLOR_Index_MIX

6BS

13 Jan 07:31
Compare
Choose a tag to compare
6BS
  • 6BS is released
  • some right items removed to not be accidentally triggered by hand

6BS
BSE
NBS
BS2
ABS_STARS

Rewrite to use common modules + whatever else

07 Jan 11:45
Compare
Choose a tag to compare
  • BSE got the biggest change
  • new more spatial BS-es

BS Exec

24 Dec 11:39
Compare
Choose a tag to compare

BS Exec - new more advanced PDF with calendars, one pdf per month.

Also:
Abstract BS gets 12 pages of pagination above and only 3 special page links at the right.