Skip to content

Commit

Permalink
Merge branch 'master' of scott.thomaslevine.com:scott-logs/
Browse files Browse the repository at this point in the history
  • Loading branch information
tlevine committed Jul 14, 2013
2 parents c2bfeed + cacf8d0 commit 71df38a
Show file tree
Hide file tree
Showing 336 changed files with 403 additions and 0 deletions.
1 change: 1 addition & 0 deletions CEMVN-NWP-2012.log
Expand Up @@ -11,3 +11,4 @@ Mon Apr 08 2013 00:00:13 GMT-0500 (CDT) bot {"characterOfWork":"","locationOfWor
Fri May 24 2013 23:38:22 GMT-0500 (CDT) bot {"characterOfWork":"","locationOfWork":""}
Sat Jun 15 2013 22:02:37 GMT-0500 (CDT) bot {"characterOfWork":"","locationOfWork":""}
Sat Jun 29 2013 01:16:23 GMT-0500 (CDT) bot {"characterOfWork":"","locationOfWork":""}
Thu Jul 11 2013 11:41:23 GMT-0500 (CDT) bot {"characterOfWork":"","locationOfWork":""}
1 change: 1 addition & 0 deletions MVK-2012-01182-SU.log
Expand Up @@ -18,3 +18,4 @@ Mon Apr 08 2013 00:00:13 GMT-0500 (CDT) bot {"characterOfWork":"CHARACTER OF WOR
Fri May 24 2013 23:38:22 GMT-0500 (CDT) bot {"characterOfWork":"CHARACTER OF WORK: The 282 acre project involves realigning LA-8 to the south of its currentlocation and to provide approaches to a replacement bridge. Approximately 8600 cubic yards of clean earthenfill and 360 yards of concrete will be discharged. Impacts to wetlands from the road and approaches will be1.23 acres of bottomland hardwoods. The bridge is subject to authority of the United States Coast Guard underSection 9 of the Rivers and Harbors Act. The existing bridge will be removed. The existing road bed will beleft in place to provide access to the river.The comment period for the Department of the Army Permit and the Louisiana Department ofEnvironmental Quality WQC will close 20 days from the date of thisjoint public notice. Written commente,including suggestions for modifications or objections to the proposed work, stating reasons thereof, are beingsolicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to bereceived before or by the last day of the comment period. Letters concerning the Corps of Engineers permitapplication must reference the applicant's name and the Permit Application Number, and be mailed to the_ Corpsof Engineers at the address above, Similar letters conceming theWater Quality Certification must reference the applicant's name and the WQC Application number and bemailed to the Louisiana Department of Environmental Quality at the address aboye. Individuals or parties mayrequest an extension of time in which to comment on the_ proposed work by writing to the project margagef Olffclicking on the project manager’s name on the pLll)l1C notice grid on the web page. Any request must :7 spam 1C","locationOfWork":""}
Sat Jun 15 2013 22:02:37 GMT-0500 (CDT) bot {"characterOfWork":"CHARACTER OF WORK: The 282 acre project involves realigning LA-8 to the south of its currentlocation and to provide approaches to a replacement bridge. Approximately 8600 cubic yards of clean earthenfill and 360 yards of concrete will be discharged. Impacts to wetlands from the road and approaches will be1.23 acres of bottomland hardwoods. The bridge is subject to authority of the United States Coast Guard underSection 9 of the Rivers and Harbors Act. The existing bridge will be removed. The existing road bed will beleft in place to provide access to the river.The comment period for the Department of the Army Permit and the Louisiana Department ofEnvironmental Quality WQC will close 20 days from the date of thisjoint public notice. Written commente,including suggestions for modifications or objections to the proposed work, stating reasons thereof, are beingsolicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to bereceived before or by the last day of the comment period. Letters concerning the Corps of Engineers permitapplication must reference the applicant's name and the Permit Application Number, and be mailed to the_ Corpsof Engineers at the address above, Similar letters conceming theWater Quality Certification must reference the applicant's name and the WQC Application number and bemailed to the Louisiana Department of Environmental Quality at the address aboye. Individuals or parties mayrequest an extension of time in which to comment on the_ proposed work by writing to the project margagef Olffclicking on the project manager’s name on the pLll)l1C notice grid on the web page. Any request must :7 spam 1C","locationOfWork":""}
Sat Jun 29 2013 01:16:23 GMT-0500 (CDT) bot {"characterOfWork":"CHARACTER OF WORK: The 282 acre project involves realigning LA-8 to the south of its currentlocation and to provide approaches to a replacement bridge. Approximately 8600 cubic yards of clean earthenfill and 360 yards of concrete will be discharged. Impacts to wetlands from the road and approaches will be1.23 acres of bottomland hardwoods. The bridge is subject to authority of the United States Coast Guard underSection 9 of the Rivers and Harbors Act. The existing bridge will be removed. The existing road bed will beleft in place to provide access to the river.The comment period for the Department of the Army Permit and the Louisiana Department ofEnvironmental Quality WQC will close 20 days from the date of thisjoint public notice. Written commente,including suggestions for modifications or objections to the proposed work, stating reasons thereof, are beingsolicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to bereceived before or by the last day of the comment period. Letters concerning the Corps of Engineers permitapplication must reference the applicant's name and the Permit Application Number, and be mailed to the_ Corpsof Engineers at the address above, Similar letters conceming theWater Quality Certification must reference the applicant's name and the WQC Application number and bemailed to the Louisiana Department of Environmental Quality at the address aboye. Individuals or parties mayrequest an extension of time in which to comment on the_ proposed work by writing to the project margagef Olffclicking on the project manager’s name on the pLll)l1C notice grid on the web page. Any request must :7 spam 1C","locationOfWork":""}
Thu Jul 11 2013 11:41:23 GMT-0500 (CDT) bot {"characterOfWork":"CHARACTER OF WORK: The 282 acre project involves realigning LA-8 to the south of its currentlocation and to provide approaches to a replacement bridge. Approximately 8600 cubic yards of clean earthenfill and 360 yards of concrete will be discharged. Impacts to wetlands from the road and approaches will be1.23 acres of bottomland hardwoods. The bridge is subject to authority of the United States Coast Guard underSection 9 of the Rivers and Harbors Act. The existing bridge will be removed. The existing road bed will beleft in place to provide access to the river.The comment period for the Department of the Army Permit and the Louisiana Department ofEnvironmental Quality WQC will close 20 days from the date of thisjoint public notice. Written commente,including suggestions for modifications or objections to the proposed work, stating reasons thereof, are beingsolicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to bereceived before or by the last day of the comment period. Letters concerning the Corps of Engineers permitapplication must reference the applicant's name and the Permit Application Number, and be mailed to the_ Corpsof Engineers at the address above, Similar letters conceming theWater Quality Certification must reference the applicant's name and the WQC Application number and bemailed to the Louisiana Department of Environmental Quality at the address aboye. Individuals or parties mayrequest an extension of time in which to comment on the_ proposed work by writing to the project margagef Olffclicking on the project manager’s name on the pLll)l1C notice grid on the web page. Any request must :7 spam 1C","locationOfWork":""}
1 change: 1 addition & 0 deletions MVN-1997-0005-CO.log

Large diffs are not rendered by default.

1 change: 1 addition & 0 deletions MVN-1997-00161-CL.log
Expand Up @@ -10,3 +10,4 @@ Mon Apr 08 2013 00:00:14 GMT-0500 (CDT) bot {"characterOfWork":"CHARACTER OF WOR
Fri May 24 2013 23:38:22 GMT-0500 (CDT) bot {"characterOfWork":"CHARACTER OF WORK: Perform dredging of approximately 6,800 cubic yards of material to install asupply boat dock, including four dolphins, two barges, and two access ramps. The applicant proposes to placeexcavated fill material on the adjacent bank and to install and maintain an 80’ x 200’ pile supported storagebuilding. The fill placement will impact approximately 0.2 acre of jurisdictional wetlands located on site, asshown on the enclosed drawings.The comment period for the Department of the Army Permit and the Louisiana Department ofEnvironmental Quality WQC will close 20 days from the date of this joint public notice. Written comments,including suggestions for modifications or objections to the proposed work, stating reasons thereof, are beingsolicited from anyone having interest in this permit and/ or this WQC request and must be mailed so as to bereceived before or by the last day of the comment period. Letters concerning the Corps of Engineers permitapplication must reference the applicant's name and the Permit Application Number, and be mailed to the Corpsof Engineers at the address above, ATTENTION: REGULATORY BRANCH. Individuals or parties mayrequest an extension of time in which to comment on the proposed work by writing to the project manager orclicking on the project manager’s name on the public notice grid on the web page. Any request must be specificand substantively supportive of the requested extension, and received by this office prior to the end of the initialcomment period. The Section Chief will review the request and the requestor will be promptly notified of thedecision to grant or deny the request. If granted, the time extension will be continuous to the initial commentperiod and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. Lettersconcerning the Water Quality Certification must reference the applicant's name and the WQC Applicationnumber and be mailed to the Louisiana Department of Environmental Quality at the address above.","locationOfWork":"LOCATION OF WORK: Located in and adjacent to the Houma Navigation Canal, Section 30, T20S—R17E,near Dulac, in Terrebonne Parish, Louisiana, as shown on the enclosed drawings."}
Sat Jun 15 2013 22:02:37 GMT-0500 (CDT) bot {"characterOfWork":"CHARACTER OF WORK: Perform dredging of approximately 6,800 cubic yards of material to install asupply boat dock, including four dolphins, two barges, and two access ramps. The applicant proposes to placeexcavated fill material on the adjacent bank and to install and maintain an 80’ x 200’ pile supported storagebuilding. The fill placement will impact approximately 0.2 acre of jurisdictional wetlands located on site, asshown on the enclosed drawings.The comment period for the Department of the Army Permit and the Louisiana Department ofEnvironmental Quality WQC will close 20 days from the date of this joint public notice. Written comments,including suggestions for modifications or objections to the proposed work, stating reasons thereof, are beingsolicited from anyone having interest in this permit and/ or this WQC request and must be mailed so as to bereceived before or by the last day of the comment period. Letters concerning the Corps of Engineers permitapplication must reference the applicant's name and the Permit Application Number, and be mailed to the Corpsof Engineers at the address above, ATTENTION: REGULATORY BRANCH. Individuals or parties mayrequest an extension of time in which to comment on the proposed work by writing to the project manager orclicking on the project manager’s name on the public notice grid on the web page. Any request must be specificand substantively supportive of the requested extension, and received by this office prior to the end of the initialcomment period. The Section Chief will review the request and the requestor will be promptly notified of thedecision to grant or deny the request. If granted, the time extension will be continuous to the initial commentperiod and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. Lettersconcerning the Water Quality Certification must reference the applicant's name and the WQC Applicationnumber and be mailed to the Louisiana Department of Environmental Quality at the address above.","locationOfWork":"LOCATION OF WORK: Located in and adjacent to the Houma Navigation Canal, Section 30, T20S—R17E,near Dulac, in Terrebonne Parish, Louisiana, as shown on the enclosed drawings."}
Sat Jun 29 2013 01:16:23 GMT-0500 (CDT) bot {"characterOfWork":"CHARACTER OF WORK: Perform dredging of approximately 6,800 cubic yards of material to install asupply boat dock, including four dolphins, two barges, and two access ramps. The applicant proposes to placeexcavated fill material on the adjacent bank and to install and maintain an 80’ x 200’ pile supported storagebuilding. The fill placement will impact approximately 0.2 acre of jurisdictional wetlands located on site, asshown on the enclosed drawings.The comment period for the Department of the Army Permit and the Louisiana Department ofEnvironmental Quality WQC will close 20 days from the date of this joint public notice. Written comments,including suggestions for modifications or objections to the proposed work, stating reasons thereof, are beingsolicited from anyone having interest in this permit and/ or this WQC request and must be mailed so as to bereceived before or by the last day of the comment period. Letters concerning the Corps of Engineers permitapplication must reference the applicant's name and the Permit Application Number, and be mailed to the Corpsof Engineers at the address above, ATTENTION: REGULATORY BRANCH. Individuals or parties mayrequest an extension of time in which to comment on the proposed work by writing to the project manager orclicking on the project manager’s name on the public notice grid on the web page. Any request must be specificand substantively supportive of the requested extension, and received by this office prior to the end of the initialcomment period. The Section Chief will review the request and the requestor will be promptly notified of thedecision to grant or deny the request. If granted, the time extension will be continuous to the initial commentperiod and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. Lettersconcerning the Water Quality Certification must reference the applicant's name and the WQC Applicationnumber and be mailed to the Louisiana Department of Environmental Quality at the address above.","locationOfWork":"LOCATION OF WORK: Located in and adjacent to the Houma Navigation Canal, Section 30, T20S—R17E,near Dulac, in Terrebonne Parish, Louisiana, as shown on the enclosed drawings."}
Thu Jul 11 2013 11:41:23 GMT-0500 (CDT) bot {"characterOfWork":"CHARACTER OF WORK: Perform dredging of approximately 6,800 cubic yards of material to install asupply boat dock, including four dolphins, two barges, and two access ramps. The applicant proposes to placeexcavated fill material on the adjacent bank and to install and maintain an 80’ x 200’ pile supported storagebuilding. The fill placement will impact approximately 0.2 acre of jurisdictional wetlands located on site, asshown on the enclosed drawings.The comment period for the Department of the Army Permit and the Louisiana Department ofEnvironmental Quality WQC will close 20 days from the date of this joint public notice. Written comments,including suggestions for modifications or objections to the proposed work, stating reasons thereof, are beingsolicited from anyone having interest in this permit and/ or this WQC request and must be mailed so as to bereceived before or by the last day of the comment period. Letters concerning the Corps of Engineers permitapplication must reference the applicant's name and the Permit Application Number, and be mailed to the Corpsof Engineers at the address above, ATTENTION: REGULATORY BRANCH. Individuals or parties mayrequest an extension of time in which to comment on the proposed work by writing to the project manager orclicking on the project manager’s name on the public notice grid on the web page. Any request must be specificand substantively supportive of the requested extension, and received by this office prior to the end of the initialcomment period. The Section Chief will review the request and the requestor will be promptly notified of thedecision to grant or deny the request. If granted, the time extension will be continuous to the initial commentperiod and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. Lettersconcerning the Water Quality Certification must reference the applicant's name and the WQC Applicationnumber and be mailed to the Louisiana Department of Environmental Quality at the address above.","locationOfWork":"LOCATION OF WORK: Located in and adjacent to the Houma Navigation Canal, Section 30, T20S—R17E,near Dulac, in Terrebonne Parish, Louisiana, as shown on the enclosed drawings."}

0 comments on commit 71df38a

Please sign in to comment.