Merge pull request #12 from wpengine/fcp-3172-sync-with-upstream-v1-7-1 #14
ci.yaml
on: push
changes
6s
security
3m 49s
test-image-build
17m 39s
Matrix: test-image
Matrix: Helm chart
Matrix: Kubernetes chroot
Matrix: Kubernetes
Annotations
14 errors and 2 warnings
Kubernetes chroot (v1.26.3)
Process completed with exit code 2.
|
Kubernetes chroot (v1.27.1)
The job was canceled because "v1_26_3" failed.
|
Kubernetes chroot (v1.27.1)
The operation was canceled.
|
Kubernetes chroot (v1.25.8)
The job was canceled because "v1_26_3" failed.
|
Kubernetes chroot (v1.25.8)
The operation was canceled.
|
Kubernetes chroot (v1.24.12)
The job was canceled because "v1_26_3" failed.
|
Kubernetes chroot (v1.24.12)
The operation was canceled.
|
Kubernetes (v1.24.12)
Process completed with exit code 2.
|
Kubernetes (v1.25.8)
The job was canceled because "v1_24_12" failed.
|
Kubernetes (v1.25.8)
The operation was canceled.
|
Kubernetes (v1.27.1)
The job was canceled because "v1_24_12" failed.
|
Kubernetes (v1.27.1)
The operation was canceled.
|
Kubernetes (v1.26.3)
The job was canceled because "v1_24_12" failed.
|
Kubernetes (v1.26.3)
The operation was canceled.
|
Kubernetes chroot (v1.26.3)
No files were found with the provided path: test/junitreports/report*.xml. No artifacts will be uploaded.
|
Kubernetes (v1.24.12)
No files were found with the provided path: test/junitreports/report*.xml. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
docker.tar.gz
Expired
|
277 MB |
|