Supplement material for paper “Repurposing Coal Power Plants into Thermal Energy Storage for Supporting Zero-carbon Data Centers”

Coal Power Plants Information

We consider that the operating coal power plants in the ERCOT system as of 2022, except for those scheduled to be retired by 2025, are eligible for retrofitting. Table I shows the information on 12 eligible coal power plants from global energy monitors [1] and US EIA [2].

Table 1 Information on 12 eligible coal power plants in Texas

Plant Plant name Capacity (MW) Start year Combustion technology Coal type Lat Lon Heat rate (Btu/kWh) Emission factor (kg CO2 /TJ)
1 Fayette Power Project 460 1988 subcritical lignite 29.92 -96.75 10,878 101,000
2 J. K. Spruce Station 566 1992 subcritical sub-bit 29.31 -98.32 10,878 96,100
3 J. K. Spruce Station 878 2010 subcritical sub-bit 29.31 -98.32 9,572 96,100
4 Limestone Generating Station 893 1985 subcritical lignite 31.42 -96.25 10,878 101,000
5 Limestone Generating Station 957 1986 subcritical lignite 31.42 -96.25 10,878 101,000
6 Major Oak power station 174.6 1990 subcritical lignite/sub-bit 31.09 -96.70 12,618 98,550
7 Major Oak power station 174.6 1991 subcritical lignite/sub-bit 31.09 -96.70 12,618 98,550
8 Oak Grove Plant 916.8 2010 supercritical lignite 31.18 -96.49 9,250 101,000
9 Oak Grove Plant 878.6 2011 supercritical lignite 31.18 -96.49 9,250 101,000
10 Parish Generating Station 614.6 1982 subcritical/ccs sub-bit 29.48 -95.63 17,155 9,610
11 San Miguel Electric Cooperative 410 1982 subcritical lignite 28.70 -98.48 11,748 101,000
12 Sandy Creek Plant 1008 2013 supercritical sub-bit 31.48 -96.96 8,409 96,100
ezcv logo
Locations of 12 coal power plants

Results from all the scenarios

In total we simulate 12 scenarios including two baseline scenarios (1) ERCOT 2030 considering retrofitting without additional DCs (2) ERCOT 2030 without additional DC loads and retrofitting. Results of all scenarios can be found in the GitHub: https://github.com/yifueve/coal_repurpose/tree/main

Table 2 Summary of the scenarios

Scenarios of Data center and Energy storage technology TES LIB TES & LIB
Zero-carbon DC, inflexible (3) (5) (9)
Zero-carbon DC, flexible (4) (6) (10)
Unconstrained DC, inflexible Not applicable (7) (11)
Unconstrained DC, flexible Not applicable (8) (12)
ezcv logo
Scenario (3) Zero-carbon DC, inflexible
ezcv logo
Scenario (1) No DCs considering retrofitting

Table 3 Result path

Scenarios Result path
(1) ../ercot_baseline/Results_retro
(2) ../ercot_baseline/Results_baseline
(3) ../ercot_IF_ZC/Results_TES
(4) ../ercot_F_ZC/Results_TES
(5) ../ercot_IF_ZC/Results_LIB
(6) ../ercot_F_ZC/Results_LIB
(7) ../ercot_IF_UC/Results_LIB
(8) ../ercot_F_UC/Results_LIB
(9) ../ercot_IF_ZC/Results_FULL
(10) ../ercot_F_ZC/Results_FULL
(11) ../ercot_IF_UC/Results_FULL
(12) ../ercot_F_UC/Results_FULL

Reference

[1] GlobalEnergyMonitor,“GlobalCoalPlantTracker,”GlobalCoalPlantTracker.Accessed:Feb.28,2023. [Online]. Available: https://globalenergymonitor.org/projects/global-coal-plant-tracker/

[2] US Energy Informa-on Administra-on, “Coal-fired electric power plants.” Accessed: Sep. 10, 2023. [Online]. Available: https://www.eia.gov/coal/data.php#prices

[3] EIA,“CapitalCostandPerformanceCharacteris-cEs-matesforU-lityScaleElectricPowerGenera-ng Technologies.” Accessed: Apr. 21, 2023. [Online]. Available: https://www.eia.gov/analysis/studies/powerplants/capitalcost/pdf/capital_cost_AEO2020.pdf

[4] “GenX.”Accessed:May24,2023.[Online].Available:genxproject.github.io/GenX/dev/