Skip to content

E2E Tests (v11.0.0-next.24, staging) #74

E2E Tests (v11.0.0-next.24, staging)

E2E Tests (v11.0.0-next.24, staging) #74

Manually triggered September 18, 2023 09:34
Status Cancelled
Total duration 15s
Artifacts

e2e.yml

on: workflow_dispatch
Matrix: docker
Matrix: executables
Matrix: npm
Fit to window
Zoom out
Zoom in

Annotations

22 errors
executables (macos-latest, bright-cli-macos-x64, 18)
The run was canceled by @lsndr.
executables (ubuntu-latest, bright-cli-linux-x64, 18)
The run was canceled by @lsndr.
docker (macos-latest)
The run was canceled by @lsndr.
executables (windows-latest, bright-cli-win-x64.exe, 18)
The run was canceled by @lsndr.
npm (macos-latest, 14)
The run was canceled by @lsndr.
msi
The run was canceled by @lsndr.
npm (windows-latest, 16)
The run was canceled by @lsndr.
npm (ubuntu-latest, 18, fedora:latest)
The run was canceled by @lsndr.
npm (macos-latest, 16)
The run was canceled by @lsndr.
npm (ubuntu-latest, 14, ubuntu:16.04)
The run was canceled by @lsndr.
npm (windows-latest, 18)
The run was canceled by @lsndr.
npm (macos-latest, 18)
The run was canceled by @lsndr.
npm (ubuntu-latest, 16)
The run was canceled by @lsndr.
npm (ubuntu-latest, 14, fedora:24)
The run was canceled by @lsndr.
npm (ubuntu-latest, 18)
The run was canceled by @lsndr.
docker (ubuntu-latest)
The run was canceled by @lsndr.
docker (ubuntu-latest)
A task was canceled.
npm (ubuntu-latest, 14)
The run was canceled by @lsndr.