refactor(qrlToString): v2 SyncQRLInternal type (#6338) #14372
ci.yml
on: push
Setup
10s
Lint Package
56s
Matrix: build-bindings
Validate Rust
0s
Matrix: E2E Tests
Trigger Qwik City E2E
0s
Annotations
5 errors
Build Insights
Process completed with exit code 1.
|
E2E Tests (ubuntu-latest, chromium)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 10 minutes.
|
E2E Tests (ubuntu-latest, chromium)
The operation was canceled.
|
E2E Tests (macos-latest, webkit)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 10 minutes.
|
E2E Tests (macos-latest, webkit)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
dist-create-qwik
|
1.67 MB |
|
dist-eslint-plugin-qwik
|
30.3 KB |
|
dist-qwik
|
18.6 MB |
|
dist-qwik-no-optimizer
|
5.28 MB |
|
dist-qwikcity
|
552 KB |
|
dist-qwiklabs
|
56.8 KB |
|
dist-qwikreact
|
11.3 KB |
|