Skip to content

add(mempool): Verify orphaned mempool transactions #1836

add(mempool): Verify orphaned mempool transactions

add(mempool): Verify orphaned mempool transactions #1836

Triggered via pull request September 9, 2024 19:45
Status Failure
Total duration 13m 16s
Billable time 34m
Artifacts

ci-build-crates.yml

on: pull_request
Generate crates matrix
21s
Generate crates matrix
Check crates matrix
3s
Check crates matrix
Matrix: build
Open or update issues for building crates individually failures
0s
Open or update issues for building crates individually failures
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
Build zebrad crate: zebrad/src/components/mempool/pending_outputs.rs#L56
methods `prune` and `len` are never used
Build zebrad crate
Process completed with exit code 101.
Build zebra-scan crate
The job was canceled because "zebrad" failed.
Build zebra-scan crate
The operation was canceled.
Build zebra-utils crate
The job was canceled because "zebrad" failed.
Build zebra-utils crate
The operation was canceled.
Build zebra-state crate
The job was canceled because "zebrad" failed.
Build zebra-state crate
Runner ubuntu-latest-m_ac2c6da74af7 did not respond to a cancelation request with 00:05:00.