Sensor kit deployment

Mario Frei edited this page Feb 25, 2020 · 3 revisions
  • We recommend assembling the entire sensor kit in the workshop, including charging of the batteries. Once all the nodes are working in the workshop, the kit can be packed up in a box be transported to the site where the measurements are going to take place. Since the gateway is battery operated, it can be transported in operational condition.
  • Upon arrival on the site, place the gateway first and ensure that it is transmitting the data to the web server. (E.g. by setting one sensor node in debugging mode).
  • Then start placing the sensor nodes. We recommend noting the position of the sensors on a floor plan.
  • Tools and Materials:
    • Adhesives and fastener
      • Thermal Tape
      • Double sided tape
        • Outdoor
        • Tesa Power Strips
        • Heat conductive
      • Glue pads (e.g. UHUU Patafix)
      • Electrical tape
      • Universal duct tape
      • Painters tape
      • Zip ties / velcro ties
    • Cleaning
      • Adhesive remover (e.g. Tesa adhesive remover)
      • Acetone
      • Window cleaner
      • Dust brush
      • Rag
      • Paper towel
      • Glass scraper
      • Sand paper
      • Trash bag
      • Latex gloves
  • Tools
    • Screwdriver
    • Knife
    • Multimeter
    • Stepladder
  • Electronics
    • Arduino ISP programmer
    • FTDI programmer
    • XBee programmer
    • Camera
    • Thermal camera - Extension cords
    • Multi-plugs
    • Spare parts
  • Documents
    • Information sheet for building owners
    • List with sensor locations
    • Questionnaire
    • Pen
    • Clipboard
  • Other
    • Pipe insulation
    • Trolley