Skip to content
This repository has been archived by the owner on Dec 13, 2022. It is now read-only.

Update prerequisites.rst #8539

Closed
wants to merge 1 commit into from
Closed

Update prerequisites.rst #8539

wants to merge 1 commit into from

Conversation

Jordan91
Copy link
Contributor

@Jordan91 Jordan91 commented Apr 6, 2020

Description

Please include a short resume of the changes and what is the purpose of PR. Any relevant information should be added to help:

  • QA Team (Quality Assurance) with tests.
  • reviewers to understand what are the stakes of the pull request.

Fixes # (issue)

Type of change

  • Patch fixing an issue (non-breaking change)
  • New functionality (non-breaking change)
  • Breaking change (patch or feature) that might cause side effects breaking part of the Software
  • Updating documentation (missing information, typo...)

Target serie

  • 2.8.x
  • 18.10.x
  • 19.04.x
  • 19.10.x
  • 20.04.x (master)

How this pull request can be tested ?

Please describe the procedure to verify that the goal of the PR is matched. Provide clear instructions so that it can be correctly tested.

Any relevant details of the configuration to perform the test should be added.

Checklist

  • I followed the coding style guidelines provided by Centreon
  • I have commented my code, especially new classes, functions or any legacy code modified. (docblock)
  • I have commented my code, especially hard-to-understand areas of the PR.
  • I have made corresponding changes to the documentation.
  • I have rebased my development branch on the base branch (master, maintenance).

Copy link
Contributor

@sc979 sc979 left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

on what version are you wanting to merge this ?
please complete the PR template target version ;)

@cgagnaire cgagnaire added area/install kind/documentation pr/internal-ps PR made by the Centreon ProServices Team status/needs-attention The PR is on-hold. The reasons are specified in the PR labels Apr 16, 2020
@ganoze
Copy link
Contributor

ganoze commented Apr 23, 2020

@Jordan91 you should rebase your branch and update the base branch of this PR to 19.10.x. Once done, I will approve it.

@kduret
Copy link
Contributor

kduret commented May 2, 2020

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Labels
area/install kind/documentation pr/internal-ps PR made by the Centreon ProServices Team status/needs-attention The PR is on-hold. The reasons are specified in the PR
Projects
None yet
Development

Successfully merging this pull request may close these issues.

5 participants