Skip to content

POC synchronized output leveraging work by Funami580 #824

POC synchronized output leveraging work by Funami580

POC synchronized output leveraging work by Funami580 #824

You are viewing an older attempt in the history of this workflow run. View latest attempt.
Triggered via pull request February 6, 2024 15:02
Status Failure
Total duration 3m 6s
Artifacts

rust.yml

on: pull_request
Matrix: cross
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (ubuntu-latest, stable, --all-features)
Process completed with exit code 101.
test (ubuntu-latest, beta, --all-features)
The job was canceled because "ubuntu-latest_stable_--al" failed.
test (ubuntu-latest, beta, --all-features)
The operation was canceled.
test (windows-latest, stable, --all-features)
The job was canceled because "ubuntu-latest_stable_--al" failed.
test (windows-latest, stable, --all-features)
The operation was canceled.
test (ubuntu-latest, stable, --all-features, --target armv5te-unknown-linux-gnueabi, true)
The job was canceled because "ubuntu-latest_stable_--al" failed.
test (macos-latest, stable, --all-features)
The job was canceled because "ubuntu-latest_stable_--al" failed.
test (macos-latest, stable, --all-features)
The operation was canceled.