Expand Up @@ -15,7 +15,7 @@ Look at Azimuth acceleration vs. power supply voltage

Introduction
=============
The contractor responsible for the TMA Power supply and capacitor banks, Phase, has indicated that it is best to keep the voltage drops during a slew to above 575 V. Excessive loss of power from the TMA could lead to poor performance of observations due to the telescope not being able to move properly. In this analysis we have followed the one performed on the `SITCOM-1146 <https://rubinobs.atlassian.net/browse/SITCOM-1146>`_, identifying each slew of the observation nights using `TMAEventMaker()`. Selecting:
The contractor responsible for the TMA Power supply and capacitor banks, Phase, has indicated that it is best to keep the voltage drops during a slew to above 575 V. Excessive loss of power from the TMA could lead to poor performance of observations due to the telescope not being able to move properly. In this analysis we have followed the one performed on the `SITCOM-1146 <https://rubinobs.atlassian.net/browse/SITCOM-1146>`_, identifying each slew of the observation nights using :numref:`TMAEventMaker()`. Selecting:

::

Expand All @@ -24,13 +24,14 @@ The contractor responsible for the TMA Power supply and capacitor banks, Phase,
lsst.sal.MTMount.azimuth


These tests analyze what is the min power supply voltage along the different movements that the telescope performs during slew (analizing their velocities and acceleration) and if in some positions or concrete movements could suggest problems. We explore the minimum `powerSupplyVoltage` as a function of slew distance, as well as the behavior during velocity and acceleration. We also explore when the telescope moves in azimuth and elevation at the same time and when it moves separately.
These tests analyze what is the min power supply voltage along the different movements that the telescope performs during slew (analizing their velocities and acceleration) and if in some positions or concrete movements could suggest problems. We explore the minimum :numref:`powerSupplyVoltage` as a function of slew distance, as well as the behavior during velocity and acceleration. We also explore when the telescope moves in azimuth and elevation at the same time and when it moves separately.

Results have been analyzed for observing nights 20240220 and 20240221. During these dates it was not possible to accelerate the telescope so the final results of this analysis are pending observational data.


Related Tickets
================
* `SITCOM-1223 <https://rubinobs.atlassian.net/browse/SITCOM-1223>`_: *TMA Capacitor Bank discharge vs. Acceleration profiles*
* `SITCOM-1146 <https://rubinobs.atlassian.net/browse/SITCOM-1146>`_: *TMA Performance Settings vs Capacitor Bank discharge*


Expand All @@ -39,8 +40,20 @@ Related Requirements
* Voltage drops during a slew must remain above 575 V.


Execution Details and Data
===========================
Details of the code can be found at this `github repository <https://github.com/lsst-sitcom/notebooks_vandv/blob/tickets/SITCOM-1223/notebooks/tel_and_site/subsys_req_ver/tma/SITCOM-1223-TMA_Capacitor_Bank_discharge_vs._Acceleration_profiles.ipynb>`_

We have performed the following analyses:

Relationship of min power supply voltage and distance of slew
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

We have investigated the relationship between the minimum power supply voltage and the distance of slew.

Initially, we attempted to calculate the slew distance using the formula for *angular distance*. In this analysis, we included an explanation of the formula and the function :numref:`calculate_angular_distance`, although ultimately, it was not used due to errors it generated.

Therefore, to analyze the slew distance, we calculated the azimuth and elevation distances. For each observation day, we examined the scatter of the differences in azimuth and elevation at the start and end of the slew with their respective minimum supply power voltage. Additionally, we created histograms of these differences in the slew and of the minimum supply power voltage used.


Add content here