Skip to content

chore(deps): update dependency bazel to v7.2.1 #1310

chore(deps): update dependency bazel to v7.2.1

chore(deps): update dependency bazel to v7.2.1 #1310

Re-run triggered June 25, 2024 17:43
Status Failure
Total duration 59s
Artifacts

main.yml

on: pull_request
configure
0s
configure
Pre-commit checks
12s
Pre-commit checks
Matrix: Run tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Run tests (examples, clang)
Process completed with exit code 1.
Run tests (., clang)
The job was canceled because "examples_clang" failed.
Run tests (., clang)
Process completed with exit code 1.
Run tests (examples, gcc)
The job was canceled because "examples_clang" failed.
Run tests (examples, gcc)
Process completed with exit code 1.
Run tests (., gcc)
The job was canceled because "examples_clang" failed.
Run tests (., gcc)
Process completed with exit code 1.