Skip to content

chore(deps): update dependency bazel to v7.2.1 #1347

chore(deps): update dependency bazel to v7.2.1

chore(deps): update dependency bazel to v7.2.1 #1347

Triggered via pull request July 1, 2024 08:15
Status Failure
Total duration 1m 8s
Artifacts

main.yml

on: pull_request
configure
0s
configure
Pre-commit checks
12s
Pre-commit checks
Matrix: Run tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Run tests (., gcc)
Process completed with exit code 1.
Run tests (examples, gcc)
The job was canceled because "_gcc" failed.
Run tests (examples, gcc)
Process completed with exit code 1.
Run tests (examples, clang)
The job was canceled because "_gcc" failed.
Run tests (examples, clang)
Process completed with exit code 1.
Run tests (., clang)
The job was canceled because "_gcc" failed.
Run tests (., clang)
Process completed with exit code 1.