Kitsune Deployments

This documents the current development (dev), staging, production (prod), and Continuous Integration (CI) servers for the support.mozilla.com instance of Kitsune.

This document will not detail how Kitsune is deployed, only why, when, and where.

The Source

All of the source code for Kitsune lives in a single Github repo. There are two important branches and we use tags.

Branches

Master

The master branch is our main integration points. All new patches should be based on the latest master (or rebased to it) and except for very rare cases, all patches should land on master first. master never has code freezes.

Our dev server runs master, and it updates after every commit using a Github service hook.

Next

The next branch provides a stable place for QA to test and verify changes before they go to production. Every week, next is wiped out and re-branched off the latest master.

Occasionally, patches need to land on next after this branch happens. They should land on master first and then be cherry-picked (with git cherry-pick) onto next.

Our staging server runs next, and it is updated manually with a big red button.

Tags

Every week, we create a new tag for a release. The tags are the date the release will go to production (e.g., the tag 2011-08-23 was pushed to prod on 23 August 2011). Tags are created from the next branch.

Production

Production runs the latest tagged version of Kitsune. It is typically updated on Tuesday afternoons, Pacific Time. Deployments to production are manually triggered.