Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Bug 1818786: Fix handling of delay in acquiring lease with stp turned on #28

Merged
merged 1 commit into from Jul 9, 2020

Conversation

dougbtv
Copy link
Member

@dougbtv dougbtv commented Jul 6, 2020

Signed-off-by: Aneesh Puttur aneeshputtur@gmail.com

Signed-off-by: Aneesh Puttur <aneeshputtur@gmail.com>
@openshift-ci-robot openshift-ci-robot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Jul 6, 2020
@dougbtv
Copy link
Member Author

dougbtv commented Jul 6, 2020

/retitle Bug 1818786: Fix handling of delay in acquiring lease with stp turned on

@openshift-ci-robot openshift-ci-robot changed the title Fix handling of delay in acquiring lease with stp turned on Bug 1818786: Fix handling of delay in acquiring lease with stp turned on Jul 6, 2020
@openshift-ci-robot openshift-ci-robot added bugzilla/severity-medium Referenced Bugzilla bug's severity is medium for the branch this PR is targeting. bugzilla/valid-bug Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting. labels Jul 6, 2020
@openshift-ci-robot
Copy link
Contributor

@dougbtv: This pull request references Bugzilla bug 1818786, which is valid. The bug has been moved to the POST state. The bug has been updated to refer to the pull request using the external bug tracker.

3 validation(s) were run on this bug
  • bug is open, matching expected state (open)
  • bug target release (4.6.0) matches configured target release for branch (4.6.0)
  • bug is in the state ASSIGNED, which is one of the valid states (NEW, ASSIGNED, ON_DEV, POST, POST)

In response to this:

Bug 1818786: Fix handling of delay in acquiring lease with stp turned on

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository.

@dougbtv
Copy link
Member Author

dougbtv commented Jul 7, 2020

/test e2e-aws

@aneeshkp
Copy link
Contributor

aneeshkp commented Jul 9, 2020

/lgtm

@openshift-ci-robot openshift-ci-robot added the lgtm Indicates that a PR is ready to be merged. label Jul 9, 2020
@openshift-ci-robot
Copy link
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: aneeshkp, dougbtv

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-bot
Copy link
Contributor

/retest

Please review the full test history for this PR and help us cut down flakes.

9 similar comments
@openshift-bot
Copy link
Contributor

/retest

Please review the full test history for this PR and help us cut down flakes.

@openshift-bot
Copy link
Contributor

/retest

Please review the full test history for this PR and help us cut down flakes.

@openshift-bot
Copy link
Contributor

/retest

Please review the full test history for this PR and help us cut down flakes.

@openshift-bot
Copy link
Contributor

/retest

Please review the full test history for this PR and help us cut down flakes.

@openshift-bot
Copy link
Contributor

/retest

Please review the full test history for this PR and help us cut down flakes.

@openshift-bot
Copy link
Contributor

/retest

Please review the full test history for this PR and help us cut down flakes.

@openshift-bot
Copy link
Contributor

/retest

Please review the full test history for this PR and help us cut down flakes.

@openshift-bot
Copy link
Contributor

/retest

Please review the full test history for this PR and help us cut down flakes.

@openshift-bot
Copy link
Contributor

/retest

Please review the full test history for this PR and help us cut down flakes.

@openshift-merge-robot openshift-merge-robot merged commit bb0d17e into openshift:master Jul 9, 2020
@openshift-ci-robot
Copy link
Contributor

@dougbtv: All pull requests linked via external trackers have merged: openshift/containernetworking-plugins#28. Bugzilla bug 1818786 has been moved to the MODIFIED state.

In response to this:

Bug 1818786: Fix handling of delay in acquiring lease with stp turned on

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
approved Indicates a PR has been approved by an approver from all required OWNERS files. bugzilla/severity-medium Referenced Bugzilla bug's severity is medium for the branch this PR is targeting. bugzilla/valid-bug Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting. lgtm Indicates that a PR is ready to be merged.
Projects
None yet
Development

Successfully merging this pull request may close these issues.

None yet

5 participants