Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

planner: add two functions to get and set cached plan from the plan cache #37112

Merged
merged 5 commits into from Aug 16, 2022

Conversation

qw4990
Copy link
Contributor

@qw4990 qw4990 commented Aug 15, 2022

What problem does this PR solve?

Issue Number: ref #36598

Problem Summary: planner: add two functions to get and set cached plan from the plan cache

What is changed and how it works?

No logical change, just refactor, add two functions to get and set cached plan from the plan cache

Check List

Tests

  • Unit test
  • Integration test
  • Manual test (add detailed scripts or steps below)
  • No code

Side effects

  • Performance regression: Consumes more CPU
  • Performance regression: Consumes more Memory
  • Breaking backward compatibility

Documentation

  • Affects user behaviors
  • Contains syntax changes
  • Contains variable changes
  • Contains experimental features
  • Changes MySQL compatibility

Release note

Please refer to Release Notes Language Style Guide to write a quality release note.

None

@ti-chi-bot
Copy link
Member

ti-chi-bot commented Aug 15, 2022

[REVIEW NOTIFICATION]

This pull request has been approved by:

  • Reminiscent
  • xuyifangreeneyes

To complete the pull request process, please ask the reviewers in the list to review by filling /cc @reviewer in the comment.
After your PR has acquired the required number of LGTMs, you can assign this pull request to the committer in the list by filling /assign @committer in the comment to help you merge this pull request.

The full list of commands accepted by this bot can be found here.

Reviewer can indicate their review by submitting an approval review.
Reviewer can cancel approval by submitting a request changes review.

@ti-chi-bot ti-chi-bot added release-note-none size/L Denotes a PR that changes 100-499 lines, ignoring generated files. labels Aug 15, 2022
}
}
// add to current candidate list
// TODO: limit the candidate list length
Copy link
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

I'll limit it in the next PR.

@ti-chi-bot
Copy link
Member

ti-chi-bot commented Aug 15, 2022

@hawkingrei
Copy link
Member

/run-all-tests

1 similar comment
@qw4990
Copy link
Contributor Author

qw4990 commented Aug 16, 2022

/run-all-tests

Copy link
Contributor

@Reminiscent Reminiscent left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Rest LGTM.

@ti-chi-bot ti-chi-bot added the status/LGT1 Indicates that a PR has LGTM 1. label Aug 16, 2022
@ti-chi-bot ti-chi-bot added status/LGT2 Indicates that a PR has LGTM 2. and removed status/LGT1 Indicates that a PR has LGTM 1. labels Aug 16, 2022
@qw4990
Copy link
Contributor Author

qw4990 commented Aug 16, 2022

/merge

@ti-chi-bot
Copy link
Member

This pull request has been accepted and is ready to merge.

Commit hash: 7c36f4d

@ti-chi-bot ti-chi-bot added the status/can-merge Indicates a PR has been approved by a committer. label Aug 16, 2022
@ti-chi-bot ti-chi-bot merged commit 97f9c22 into pingcap:master Aug 16, 2022
@sre-bot
Copy link
Contributor

sre-bot commented Aug 16, 2022

TiDB MergeCI notify

CI Name Result Duration Compare with Parent commit
idc-jenkins-ci/integration-cdc-test 🟢 all 36 tests passed 47 min Existing passed
idc-jenkins-ci-tidb/integration-common-test 🟢 all 17 tests passed 26 min Existing passed
idc-jenkins-ci-tidb/common-test 🟢 all 11 tests passed 13 min Existing passed
idc-jenkins-ci-tidb/integration-ddl-test 🟢 all 6 tests passed 8 min 34 sec Existing passed
idc-jenkins-ci-tidb/tics-test 🟢 all 1 tests passed 6 min 52 sec Existing passed
idc-jenkins-ci-tidb/sqllogic-test-1 🟢 all 26 tests passed 5 min 52 sec Existing passed
idc-jenkins-ci-tidb/sqllogic-test-2 🟢 all 28 tests passed 5 min 30 sec Existing passed
idc-jenkins-ci-tidb/mybatis-test 🟢 all 1 tests passed 3 min 35 sec Existing passed
idc-jenkins-ci-tidb/integration-compatibility-test 🟢 all 1 tests passed 3 min 12 sec Existing passed
idc-jenkins-ci-tidb/plugin-test 🟢 build success, plugin test success 4min Existing passed

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
epic/plan-cache release-note-none sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files. status/can-merge Indicates a PR has been approved by a committer. status/LGT2 Indicates that a PR has LGTM 2.
Projects
None yet
Development

Successfully merging this pull request may close these issues.

None yet

6 participants