Closing/draining redundancies #3907
Labels
-transport
editorial
An issue that does not affect the design of the protocol; does not require consensus.
Projects
The section on Immediate Close contains some text that is redundant with the section on the Closing and Draining periods. Factor some of this out.
The text was updated successfully, but these errors were encountered: