Skip to content

build: Upgrading version from 1.0.0 to 1.1.0 #155

build: Upgrading version from 1.0.0 to 1.1.0

build: Upgrading version from 1.0.0 to 1.1.0 #155

Re-run triggered May 28, 2024 09:51
Status Failure
Total duration 2m 24s
Artifacts

main.yml

on: pull_request
Generate matrix from cabal
3s
Generate matrix from cabal
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
GHC 8.10.7 on ubuntu-latest
Process completed with exit code 1.
GHC 8.10.7 on macos-12
The job was canceled because "_8_10_7_ubuntu-latest" failed.
GHC 8.10.7 on macos-12
The operation was canceled.
GHC 9.4.7 on macos-12
The job was canceled because "_8_10_7_ubuntu-latest" failed.
GHC 9.4.7 on macos-12
The operation was canceled.
GHC 9.4.7 on ubuntu-latest
The job was canceled because "_8_10_7_ubuntu-latest" failed.
GHC 9.4.7 on ubuntu-latest
The operation was canceled.