Merge app renderer process (#54143) #7309
build_and_test.yml
on: push
build-next
/
build
19s
build-native
/
build
15s
validate-docs-links
9s
test cargo unit
/
build
18s
test cargo integration
/
build
29s
test cargo benchmarks
/
build
25s
rust check
/
build
14s
Matrix: test dev
Matrix: test integration
Matrix: test prod
Matrix: test turbopack integration
Matrix: test experimental turbopack integration
lint
/
build
1m 5s
types and precompiled
/
build
43s
test experimental turbopack dev
/
build
59s
test next-swc wasm
/
build
2m 12s
test firefox and safari
/
build
4m 23s
report-test-results
/
build
thank you, next
1s
Annotations
4 errors and 2 warnings
test dev (3) / build
Process completed with exit code 1.
|
test integration (11) / build
The job running on runner nextjs-hel1-26 has exceeded the maximum execution time of 25 minutes.
|
test integration (11) / build
The operation was canceled.
|
thank you, next
Process completed with exit code 1.
|
rust check / build
No files were found with the provided path: .turbo/runs. No artifacts will be uploaded.
|
test cargo unit / build
No files were found with the provided path: .turbo/runs. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
Test trace reports
Expired
|
2.54 MB |
|
turbo run summary
Expired
|
28.3 MB |
|