-
Notifications
You must be signed in to change notification settings - Fork 0
access_ATIWG_001
trac edited this page Oct 9, 2014
·
1 revision
Mike Naughton, Wenming Lu
Tue 18-Feb-2014 meeting
Attendees: Ian, Scott, Mike, Jim, Peter Steinle, Chris, Jin, Jhan, Zhihong, Asri, Ilia, Robin, Joan, Martin, Wenming; Xiao (Phone)
a. twister-ngamai
- Ian has installed Rose-Cylc on twister-ngamai and written wiki documentation; Xiao has tested and is using the installation
- Rose-Cylc is working with minor issues; such as broken connection between twister and ngamai; Ian is investigating issue with daily reset occurring on twister
b. accessdev-raijin
- Accessdev has not been released officially yet; however, Xiao, Ian, Wenming and many other researchers have been using Rose-Cylc to do experiments and research
- Rose, Cylc, rosie, rose-bush, rosebud, rose-stem all working
- UM vn8.6 installed
- rose-stem: Martin has rose-stem nci_test examples working
- umui: Say/Asri et al to install umui
- rosebud: vn 8.5 should probably also work for vn 8.6
- UM vn9.0 -- plan to collaborate with Met Office on pre-release version, in relation to new rose-stem install procedures
- Xiao had problems in January with Cylc submitting 1000's of jobs to raijin; fixed by update to Cylc supplied by Hilary Oliver
- Rose-bush browser checking suite log files is working on accessdev
- Ian is looking at following issues:
- Issue with large job output files not automatically coming back to accessdev; need to document and inform users of required workarounds if required (Ref.
AD#19
) - Enabling Rose-Cylc with csh login shell (
AD#77
) - Enabling Rose-Cylc without needing to put module load's into login scripts (
AD#34
)- OK for Rose, doesn't seem to be way to do this for Cylc; Ian to report to Cylc developers
- Issue with large job output files not automatically coming back to accessdev; need to document and inform users of required workarounds if required (Ref.
- Discussion to have a central place for sharing Rose metadata files for standard UM versions
- Accessdev housekeeping issues:
- Robin has distrubuted notes from 4-Feb meeting
- accessdev to move to cinder should resolve a number issues (
AD#60
) - /g/data project areas to be mounted on accessdev (
AD#72
) - mail now working from accessdev to Bureau
- Accessdev trac wiki to be used for Rose-Cylc issue tracking; cross-reference items here as AD#nnn, or via links
a. Training
- 24 Jan 2014: Wenming and Mike have done ACCESS-C standard experiment training/demo at BoM, people from BoM, CSIRO and universities attended the training
- 12-14 Feb 2014: Wenming attended AMOS2014 at Hobart to bring the ACCESS standard experiments & CWSL virtual lab to wider community
- 26 Mar 2014: One day training at BoM to include the following subjects
- Martin: Introduction of Rose-Cylc and accessdev-raijin; simple Rose-Cylc demo
- Wenming: ACCESS-C Rose-Cylc standard experiment training
- Ian: ACCESS Rose-Cylc Climate experiment training
- Scott: COE standard ACCESS UMUI experiments
- Ian: Rose suites for building UM executables
- Plan:
- 5 Mar draft versions of training sessions; 12 Mar WG meeting review
- Formats to include both power point slides for presentation and wiki for detailed instructions
b. Documentation
- Access wiki to continue to be kept up to date covering basics about Rose-Cylc, user setup and environment, etc
- Ian, Martin: Work on NeCTAR project deliverables
- Access Model Experiments Library wiki (AMEL)
- Wenming: Adding ACCESS-X version for ACCESS-C experiments
- Ian: Add Rose-Cylc ACCESS Climate suite
- Add link to Scott's documentation of Stuart Webster vn8.5 ENDGAME jobs in CMS wiki
- Ditto to other documentation of Stuart W's configurations
- Add links to Xiao's ACCESS-NWP Assimilation-Forecast suites (SREP, Global N512)
- Ian/Xiao: Add N512 APS2 ACCESS-G forecast-only suite
- Aim to make Rose-Cylc suites consistent on twister/ngamai and accessdev/raijin
- APS2 ACCESS-G to be the suite design lab; ref Peter's ACCESS-NWP suites WG. Use this as basis to make for all ACCESS systems to have consistent design, structure and style, such as regarding conf, data, apps etc.
- Scott/Ian have installed reviewboard reviewing tool on accessdev; see
AD#66
- Martin/Ian to evaluate
- Consider reviewboard demo for later meeting
- Mike: Paper distributed about ACCESS-NWP infrastructure for research and operations
- Proposed visit by Hilary Oliver
- Met Office Collaboration
- New UM license ready to be signed soon
- Several V-C's have been held in Jan-Feb on TI Collaboration Plans for 2014-15; info is in TI section of collab_wiki
- TI Project TAG Meeting next week (Mike, Martin, Scott)
- Cylc development issues for operational suites cf. SMS capabilities
- Multi-suite Cylc gui -- Mike circulated info, Xiao has tried this, might be good to have demo some time
- Task ordering in Cylc viewer (Action: Add item to AD# for this)
- Limits capability for ensembles etc -- after meeting, found this in Cylc sec. 12.11.2
- Discussion on moving accesscollab/access-svn/trac machines to accessdev functionalty: to be considered later in the year, after all current accessdev management steps get completed
- RDSI project: Tan Le now copying operational ACCESS-G/R/C to NCI rr4 area in near-real-time; other dates can be added as required. Need to manage/request space.
- NCI training on parallel programming, performance and optimisation being planned for May 2014
- Ilia has achieved major model speedup using Async I/O; still working on ironing out several issues
- Mike, Martin, Scott, Wenming to attend UM Users Workshop in June. Wenming to also attend UM Users Tutorial; UMUT will still be primarily UMUI-based, Met Office not planning to switch UMUT to Rose until 2015