The following shows the section of the Microsoft Office Project 2007 XML Data Interchange Schema (mspdi_pj12.xsd) that defines the Resources element.
The complete Project XML Data Interchange Schema is included in the Project 2007 SDK download. For a link to the Project 2007 SDK download, see Welcome to the Microsoft Office Project 2007 SDK.
<?xml version="1.0" encoding="utf-8"?>
. . .
<!-- @Resource schema -->
<xsd:element name="Resources" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The collection of resources that make up the project.</xsd:documentation>
</xsd:annotation>
<xsd:complexType>
<xsd:sequence>
<xsd:element name="Resource" minOccurs="0" maxOccurs="unbounded">
<xsd:annotation>
<xsd:documentation>There must be at least one resource in each Resources collection.</xsd:documentation>
</xsd:annotation>
<xsd:complexType>
<xsd:sequence>
<xsd:element name="UID" type="xsd:integer">
<xsd:annotation>
<xsd:documentation>The unique identifier of the resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="ID" type="xsd:integer" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The position identifier of the resource within the list of resources.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="Name" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The name of the resource.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="512" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="Type" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The type of resource. Values are: 0=Material, 1=Work.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:integer">
<xsd:enumeration value="0" />
<xsd:enumeration value="1" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="IsNull" type="xsd:boolean" minOccurs="0">
<xsd:annotation>
<xsd:documentation>Specifies whether the resource is null.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="Initials" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The initials of the resource.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="512" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="Phonetics" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The phonetic spelling of the resource name. For use with Japanese only.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="512" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="NTAccount" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The NT account associated with the resource.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="512" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="MaterialLabel" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The unit of measure for the material resource.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="512" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="Code" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The code or other information about the resource.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="512" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="Group" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The group to which the resource belongs.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="512" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="WorkGroup" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The type of workgroup to which the resource belongs. Values are: 0=Default, 1=None, 2=Email, 3=Web.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:integer">
<xsd:enumeration value="0" />
<xsd:enumeration value="1" />
<xsd:enumeration value="2" />
<xsd:enumeration value="3" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="EmailAddress" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The e-mail address of the resource.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="512" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="Hyperlink" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The title of the hyperlink associated with the resource.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="512" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="HyperlinkAddress" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The hyperlink associated with the resource.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="512" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="HyperlinkSubAddress" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The document bookmark of the hyperlink associated with the resource.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="512" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="MaxUnits" type="xsd:float" default="1.0" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The maximum number of units that the resource is available.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="PeakUnits" type="xsd:float" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The largest number of units assigned to the resource at any time.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="OverAllocated" type="xsd:boolean" minOccurs="0">
<xsd:annotation>
<xsd:documentation>Whether the resource is overallocated.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="AvailableFrom" type="xsd:dateTime" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The first date that the resource is available.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="AvailableTo" type="xsd:dateTime" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The last date the resource is available.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="Start" type="xsd:dateTime" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The scheduled start date of the resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="Finish" type="xsd:dateTime" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The scheduled finish date of the resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="CanLevel" type="xsd:boolean" minOccurs="0">
<xsd:annotation>
<xsd:documentation>Whether the resource can be leveled.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="AccrueAt" minOccurs="0">
<xsd:annotation>
<xsd:documentation>How cost is accrued against the resource. Values are: 1=Start, 2=End, 3=Prorated, $New4=Invalid.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:integer">
<xsd:enumeration value="1" />
<xsd:enumeration value="2" />
<xsd:enumeration value="3" />
<xsd:enumeration value="4" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="Work" type="xsd:duration" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The total work assigned to the resource across all assigned tasks.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="RegularWork" type="xsd:duration" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The amount of non-overtime work assigned to the resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="OvertimeWork" type="xsd:duration" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The amount of overtime work assigned to the resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="ActualWork" type="xsd:duration" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The amount of actual work performed by the resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="RemainingWork" type="xsd:duration" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The amount of remaining work required to complete all assigned tasks.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="ActualOvertimeWork" type="xsd:duration" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The amount of actual overtime work performed by the resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="RemainingOvertimeWork" type="xsd:duration" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The amount of remaining overtime work required to complete all tasks.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="PercentWorkComplete" type="xsd:integer" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The percentage of work completed across all tasks.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="StandardRate" type="xsd:decimal" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The standard rate of the resource. This value is as of the current date if a rate table exists for the resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="StandardRateFormat" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The units used by Microsoft Office Project to display the standard rate. 1=m, 2=h, 3=d, 4=w, 5=mo, 7=y, 8=material resource rate (or blank symbol specified).</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:integer">
<xsd:enumeration value="1" />
<xsd:enumeration value="2" />
<xsd:enumeration value="3" />
<xsd:enumeration value="4" />
<xsd:enumeration value="5" />
<xsd:enumeration value="7" />
<xsd:enumeration value="8" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="Cost" type="xsd:decimal" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The total project cost for the resource across all assigned tasks.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="OvertimeRate" type="xsd:decimal" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The overtime rate of the resource. This value is as of the current date if a rate table exists for the resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="OvertimeRateFormat" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The units used by Microsoft Office Project to display the overtime rate. 1=m, 2=h, 3=d, 4=w, 5=mo, 7=y.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:integer">
<xsd:enumeration value="1" />
<xsd:enumeration value="2" />
<xsd:enumeration value="3" />
<xsd:enumeration value="4" />
<xsd:enumeration value="5" />
<xsd:enumeration value="7" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="OvertimeCost" type="xsd:decimal" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The total overtime cost for the resource including actual and remaining overtime costs.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="CostPerUse" type="xsd:decimal" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The cost per use of the resource. This value is as of the current date if a rate table exists for the resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="ActualCost" type="xsd:decimal" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The actual cost incurred by the resource across all assigned tasks.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="ActualOvertimeCost" type="xsd:decimal" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The actual overtime cost incurred by the resource across all assigned tasks.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="RemainingCost" type="xsd:decimal" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The remaining projected cost of the resource to complete all assigned tasks.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="RemainingOvertimeCost" type="xsd:decimal" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The remaining projected overtime cost of the resource to complete all assigned tasks.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="WorkVariance" type="xsd:float" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The difference between the baseline work and the work as minutes x 1000.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="CostVariance" type="xsd:float" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The difference between the baseline cost and the cost.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="SV" type="xsd:float" minOccurs="0">
<xsd:annotation>
<xsd:documentation>Earned value schedule variance, through the project status date.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="CV" type="xsd:float" minOccurs="0">
<xsd:annotation>
<xsd:documentation>Earned value cost variance, through the project status date.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="ACWP" type="xsd:float" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The actual cost of the work performed by the resource for the project to date.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="CalendarUID" type="xsd:integer" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The resource calendar. Refers to a valid UID in the Calendars element of the Microsoft Office Project 2007 XML Schema.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="Notes" type="xsd:string" minOccurs="0">
<xsd:annotation>
<xsd:documentation>Text notes associated with the resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="BCWS" type="xsd:float" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The budget cost of work scheduled for the resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="BCWP" type="xsd:float" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The budgeted cost of of the work performed by the resource for the project to date.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="IsGeneric" type="xsd:boolean" minOccurs="0">
<xsd:annotation>
<xsd:documentation>Specifies whether the resource is generic.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="IsInactive" type="xsd:boolean" minOccurs="0">
<xsd:annotation>
<xsd:documentation>Specifies whether the resource is set to inactive.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="IsEnterprise" type="xsd:boolean" minOccurs="0">
<xsd:annotation>
<xsd:documentation>Specifies whether the resource is an Enterprise resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="BookingType" minOccurs="0">
<xsd:annotation>
<xsd:documentation>Specifies the booking type of the resource. 1=Commited, 2=Proposed.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:integer">
<xsd:enumeration value="0" />
<xsd:enumeration value="1" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="ActualWorkProtected" type="xsd:duration" minOccurs="0">
<xsd:annotation>
<xsd:documentation>Specifies the duration through which actual work is protected.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="ActualOvertimeWorkProtected" type="xsd:duration" minOccurs="0">
<xsd:annotation>
<xsd:documentation>Specifies the duration through which actual overtime work is protected.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="ActiveDirectoryGUID" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The Active Directory GUID for the resource.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="16" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="CreationDate" type="xsd:dateTime" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The date that the resource was created.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="ExtendedAttribute" minOccurs="0" maxOccurs="unbounded">
<xsd:annotation>
<xsd:documentation>The value of an extended attribute. Two pieces of data are needed: a pointer back to the extended attribute table that is specified either by the unique ID or the Field ID, and the value that is specified either with the value, or a pointer back to the value list.</xsd:documentation>
</xsd:annotation>
<xsd:complexType>
<xsd:sequence>
<xsd:element name="FieldID" type="xsd:string" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The project ID (PID) of the custom field.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="Value" type="xsd:string" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The actual value of the extended attribute.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="ValueGUID" type="xsd:string" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The GUID of the value in the extended attribute lookup table.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="DurationFormat" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The format for expressing the bulk duration. Values are: 3=m, 4=em, 5=h, 6=eh, 7=d, 8=ed, 9=w, 10=ew, 11=mo, 12=emo, 19=%, 20=e%, 21=null, 35=m?, 36=em?, 37=h?, 38=eh?, 39=d?, 40=ed?, 41=w?, 42=ew?, 43=mo?, 44=emo?, 51=%?, 52=e%? and 53=null.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:integer">
<xsd:enumeration value="3" />
<xsd:enumeration value="4" />
<xsd:enumeration value="5" />
<xsd:enumeration value="6" />
<xsd:enumeration value="7" />
<xsd:enumeration value="8" />
<xsd:enumeration value="9" />
<xsd:enumeration value="10" />
<xsd:enumeration value="11" />
<xsd:enumeration value="12" />
<xsd:enumeration value="19" />
<xsd:enumeration value="20" />
<xsd:enumeration value="21" />
<xsd:enumeration value="35" />
<xsd:enumeration value="36" />
<xsd:enumeration value="37" />
<xsd:enumeration value="38" />
<xsd:enumeration value="39" />
<xsd:enumeration value="40" />
<xsd:enumeration value="41" />
<xsd:enumeration value="42" />
<xsd:enumeration value="43" />
<xsd:enumeration value="44" />
<xsd:enumeration value="51" />
<xsd:enumeration value="52" />
<xsd:enumeration value="53" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
</xsd:sequence>
</xsd:complexType>
</xsd:element>
<xsd:element name="Baseline" minOccurs="0" maxOccurs="unbounded">
<xsd:annotation>
<xsd:documentation>The baseline values for the resources.</xsd:documentation>
</xsd:annotation>
<xsd:complexType>
<xsd:sequence>
<xsd:element name="Number" type="xsd:integer">
<xsd:annotation>
<xsd:documentation>The unique number of the baseline data record.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="Work" type="xsd:duration" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The work assigned to the resource when the baseline is saved.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="Cost" type="xsd:float" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The projected cost for the resource when the baseline was saved.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="BCWS" type="xsd:float" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The budgeted cost of work scheduled for the resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="BCWP" type="xsd:float" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The budgeted cost of the work performed by the resource for the project to date.</xsd:documentation>
</xsd:annotation>
</xsd:element>
</xsd:sequence>
</xsd:complexType>
</xsd:element>
<xsd:element name="OutlineCode" minOccurs="0" maxOccurs="unbounded">
<xsd:annotation>
<xsd:documentation>The value of an outline code. Two pieces of data are necessary - a pointer to the outline code table that is specified by the FieldID, and the value that is specified either by the ValueID or ValueGUID pointer to the value list.</xsd:documentation>
</xsd:annotation>
<xsd:complexType>
<xsd:sequence>
<xsd:element name="FieldID" type="xsd:string">
<xsd:annotation>
<xsd:documentation>The number value of the custom field project ID (PID).</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="ValueID" type="xsd:integer" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The ID in the value list associated with the definition in the outline code collection.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="ValueGUID" type="xsd:integer" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The GUID of the value in the value list. The ValueGUID matches the FieldGUID in the value list.</xsd:documentation>
</xsd:annotation>
</xsd:element>
</xsd:sequence>
</xsd:complexType>
</xsd:element>
<xsd:element name="IsCostResource" type="xsd:boolean" minOccurs="0">
<xsd:annotation>
<xsd:documentation>Specifies whether the resource is a cost resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="AssnOwner" type="xsd:string" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The name of the assignment owner.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="AssnOwnerGuid" type="xsd:string" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The GUID of the assignment owner.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="IsBudget" type="xsd:boolean" minOccurs="0">
<xsd:annotation>
<xsd:documentation>Specifies whether the resource is a budget resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="AvailabilityPeriods" minOccurs="0">
<xsd:annotation>
<xsd:documentation>A collection of periods during which the resource is available.</xsd:documentation>
</xsd:annotation>
<xsd:complexType>
<xsd:sequence>
<xsd:element name="AvailabilityPeriod" minOccurs="0" maxOccurs="unbounded">
<xsd:annotation>
<xsd:documentation>The period that the resource is available.</xsd:documentation>
</xsd:annotation>
<xsd:complexType>
<xsd:sequence>
<xsd:element name="AvailableFrom" type="xsd:dateTime" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The date that the resource becomes available for the specified period.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="AvailableTo" type="xsd:dateTime" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The last date that the resource is available for the specified period.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="AvailableUnits" type="xsd:float" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The percentage that the resource is available during the specified period.</xsd:documentation>
</xsd:annotation>
</xsd:element>
</xsd:sequence>
</xsd:complexType>
</xsd:element>
</xsd:sequence>
</xsd:complexType>
</xsd:element>
<xsd:element name="Rates" minOccurs="0">
<xsd:annotation>
<xsd:documentation>A collection of periods and the rates associated with each one.</xsd:documentation>
</xsd:annotation>
<xsd:complexType>
<xsd:sequence>
<xsd:element name="Rate" minOccurs="0" maxOccurs="25">
<xsd:annotation>
<xsd:documentation>The definition of a time period, and the rates applicable for the resource during that period.</xsd:documentation>
</xsd:annotation>
<xsd:complexType>
<xsd:sequence>
<xsd:element name="RatesFrom" type="xsd:dateTime">
<xsd:annotation>
<xsd:documentation>The date that the rate becomes effective.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="RatesTo" type="xsd:dateTime">
<xsd:annotation>
<xsd:documentation>The last date that the rate is effective.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="RateTable" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The unique identifier of the rate table for the resource. Values are: 0=A, 1=B, 2=C, 3=D, 4=E.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:integer">
<xsd:enumeration value="0" />
<xsd:enumeration value="1" />
<xsd:enumeration value="2" />
<xsd:enumeration value="3" />
<xsd:enumeration value="4" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="StandardRate" type="xsd:decimal" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The standard rate for the resource for the period specified.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="StandardRateFormat" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The units used by Microsoft Office Project to display the standard rate. 1=m, 2=h, 3=d, 4=w, 5=mo, 7=y.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:integer">
<xsd:enumeration value="1" />
<xsd:enumeration value="2" />
<xsd:enumeration value="3" />
<xsd:enumeration value="4" />
<xsd:enumeration value="5" />
<xsd:enumeration value="7" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="OvertimeRate" type="xsd:decimal" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The overtime rate for the resource for the period specified.</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="OvertimeRateFormat" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The units used by Microsoft Office Project to display the overtime rate. 1=m, 2=h, 3=d, 4=w, 5=mo, 7=y.</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:integer">
<xsd:enumeration value="1" />
<xsd:enumeration value="2" />
<xsd:enumeration value="3" />
<xsd:enumeration value="4" />
<xsd:enumeration value="5" />
<xsd:enumeration value="7" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="CostPerUse" type="xsd:decimal" minOccurs="0">
<xsd:annotation>
<xsd:documentation>The cost per use of the resource. This value is as of the current date if a rate table exists for the resource.</xsd:documentation>
</xsd:annotation>
</xsd:element>
</xsd:sequence>
</xsd:complexType>
</xsd:element>
</xsd:sequence>
</xsd:complexType>
</xsd:element>
<!-- ##New Project 2007 resource enterprise custom field elements are written here. See ResEntCF.xsd for element definitions. See the document ReadMe-XML Schemas in the C:\2007 Office System Developer Resources\Project 2007 SDK\Schemas directory for more information. -->
<!-- ##Local custom field data is written here. See the document ReadMe-XML Schemas in the C:\2007 Office System Developer Resources\Project 2007 SDK\Schemas directory for more information. -->
<xsd:element name="TimephasedData" type="TimephasedDataType" minOccurs="0" maxOccurs="unbounded">
<xsd:annotation>
<xsd:documentation>The time phased data.</xsd:documentation>
</xsd:annotation>
</xsd:element>
</xsd:sequence>
</xsd:complexType>
</xsd:element>
</xsd:sequence>
</xsd:complexType>
</xsd:element>