-
Notifications
You must be signed in to change notification settings - Fork 3
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
- Loading branch information
Showing
1 changed file
with
97 additions
and
96 deletions.
There are no files selected for viewing
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -1,126 +1,127 @@ | ||
These are sample SCC (Swift Construction Workflows), based on the Aircraft Wireless product. | ||
Following are representative SCC (Swift Construction Company) workflows, based | ||
on the Aircraft Wireless product. | ||
|
||
The SCC buys assembled electronics circuit boards (Part Number 20000003) in lots of 10 from Trilogy-Net. The circuit boards are used to manufacture Aircraft Wireless units (PN 10000003). When circuit boards from Trilogy-Net arrive at the SCC, they are inspected and, if acceptable, identified with a serial number and stored on a shelf. One of the SCC’s customers is B&E Submarines, who some time ago purchased an Aircraft Wireless system from the SCC to evaluate. | ||
## Overview | ||
|
||
The products (part numbers), customer (B&E) and supplier (Trilogy-Net) have been created. Two BoMs have been created, one for the finished Aircraft Wireless product (PN 10000003) and one for a spare parts kit (PN 60000001), which includes the electronics circuit board (PN 20000003). | ||
One of the SCC's most popular product is the Aircraft Wireless, PN (part | ||
number) 10000003. The most significant customer for the Aircraft Wireless is | ||
UFM (Universal Flying Machines), who sponsored the initial development effort. | ||
The SCC has received recent inquiries from B&E Submarines, who are interested | ||
in evaluating the Aircraft Wireless for communicating with their fleet of | ||
submarines when surfaced. | ||
|
||
## Items | ||
### Add New Item Attributes | ||
To build Aircraft Wireless units, the SCC first purchases assembled electronics | ||
circuit boards (PN 20000003) in lots of 10. The circuit boards are inspected | ||
and serialized when received from the electronics contract manufacturer, then | ||
stored until needed. Finished units are assembled in-house as needed | ||
(i.e. build-to-order), using the previously assembled circuit boards and other | ||
components. Although the Aircraft Wireless was designed to withstand harsh | ||
environments, a field spares kit is available with the necessary parts to repair | ||
most catastrophic failures. | ||
|
||
* Type (pv-pn.PNType) | ||
* Creation date (pv-pn.PNDate) | ||
* Designer (pv-pn.PNReqBy) | ||
* Stock Location (pv-pn.PNUser9) | ||
* Stock Bin (pv-pn.PNUser10) | ||
* Title (pv-pn.PNTitle) ??? | ||
* Detail (pv-pn.PNDetail) ??? | ||
It is assumed that all necessary parts, customers and suppliers are available | ||
in the Maestro database (which will be the case if you installed the SCC | ||
dataset into Maestro). | ||
|
||
### Import Items | ||
|
||
### Import Item Sources | ||
## On-Going Business Processes | ||
### Create Opportunity | ||
|
||
* pv_su.csv | ||
* pv_mfr.csv | ||
* pv_mfrpn.csv | ||
* Create Opportunity: Airforce Trial | ||
* Create Customer: B&E Submarines | ||
* Changed state to Proposition | ||
* Logged a note and attach proposal (docx and pdf) | ||
* Scheduled a discussion meeting, mark done | ||
* Update expected revenue and risk percentage | ||
* Change state to Negotiation | ||
* Add Technical Approval | ||
* Change opportunity state to Won | ||
* Create Quotation | ||
* Convert Quotation to Sales Order | ||
|
||
### Import BOMs | ||
### Create Sales Order | ||
* Create invoice, validate, print PDF | ||
|
||
* pv_pl.csv | ||
### Purchase Raw Materials | ||
|
||
## Sales | ||
### Create Customer | ||
* buy circuit boards | ||
* receive and serialize circuit boards | ||
|
||
Menu: Selling > Customer > +New > B&E Submarines | ||
### Manufacture Finished Product | ||
|
||
Contact | ||
* Edward Bentley | ||
* Create manufacturing order | ||
* Issue raw material to order (including serialized PCAs) | ||
* Test product | ||
|
||
### Create Sales Order | ||
* Create invoice, validate, print PDF | ||
* Leave invoice UNPAID PAID (do not "Register Payment") | ||
### Deliver Product | ||
|
||
### Create Opportunity | ||
* Deliver order to customer | ||
|
||
TODO - must be updated. | ||
|
||
``` | ||
Settings / Users / Jacab Wood / Edit / | ||
Preferences / Default Sales Team: Sales Department | ||
Access Rights / Sales / Manager | ||
Sales / Customers / Edward Bentley / Edit / | ||
Sales & Purchases / Salesperson / Jacab Wood | ||
Sales & Purchases / Sales Team / Sales Department | ||
Sales / Opportunities / Create | ||
Subject: Airforce Trial | ||
changed state to Proposition | ||
logged a note, attached proposal (docx and pdf) | ||
noted attaching files to note is essentially same as using Attachment | ||
button, but leaves nice audit trail | ||
scheduled call, marked done | ||
updated expected revenue and risk percentage | ||
change stage to negotiation | ||
added Technical Approval to stages of the sale (kanban view) | ||
change stage to Won | ||
Create Quotation (book calls it "Make Quotation") | ||
Quotation SO002 | ||
Left quotation as-is (did not convert to Sales Order) | ||
``` | ||
|
||
### Create Lead | ||
|
||
TODO - must be updated. | ||
|
||
``` | ||
Sales / Leads / Create Fenwick Hosmer (Hosmer Engineering) | ||
did not identify as customer | ||
save | ||
did not create custom stages for "Sales Department" as shown in book, however... | ||
Sales / Configuration / Sales Teams / Sales Department | ||
why isn't Jacab Wood shown as Team Members?!? | ||
could add manually but did not (unsure if need to and also implications of doing so) | ||
profile for Jacab shows Default Sales Team = Sales Department - perhaps only when documents "pushed" from user? | ||
``` | ||
|
||
### Return Material Authorization Process | ||
|
||
TODO - must be described. | ||
|
||
## Purchasing | ||
### Purchase Product from Supplier | ||
|
||
* buy ??? from ??? | ||
* serialized! | ||
|
||
## Manufacturing | ||
### Create, sell, ship, and return a field spares kit | ||
### Accept Return of Product | ||
|
||
* Create manufacturing order | ||
* Issue material to order (serialized PCA) | ||
* Deliver order to customer | ||
* Return order from customer | ||
* Return material to stock (serialized PCA) | ||
Product may be returned for a variety of reasons, including defects and no | ||
longer required. This process is sometimes called an RMA (Return Material | ||
Authorization) process. | ||
|
||
### Re-Verification Test | ||
* Receive returned stock from customer | ||
* Inspect and Re-Validate | ||
* Re-stock | ||
|
||
TODO - must be described. | ||
|
||
## Projects | ||
### Import Projects (import/projects.csv) | ||
## Project Processes | ||
|
||
TODO: to be completed | ||
* TODO | ||
|
||
|
||
## Issue Processes | ||
|
||
* TODO | ||
|
||
## Reporting | ||
### Serialized Stock Purchased by a Customer | ||
|
||
This workflow explores serialized stock in the context of a customer purchase. B&E Submarines desires to purchase a spare parts kit for the Aircraft Wireless unit they previously purchased. A serialized circuit board is used in the assembly of the spare parts kit (preferably a phantom-type BoM to make the parts in it visible), which is then sold and delivered to B&E. | ||
This workflow explores serialized stock in the context of a customer | ||
purchase. B&E Submarines desires to purchase a spare parts kit for the Aircraft | ||
Wireless unit they previously purchased. A serialized circuit board is used in | ||
the assembly of the spare parts kit (preferably a phantom-type BoM to make the | ||
parts in it visible), which is then sold and delivered to B&E. | ||
|
||
Sometime later, Ed Bentley calls from B&E. He says he found a circuit board, but he doesn't know if it is the circuit board from the spares kit. Ed is not sure, but he thinks the original board might have failed and he swapped it with the one from the spare parts kit. Ed wants to know if the serial number on the board is the same as the board shipped in the spare parts kit he bought. | ||
Sometime later, Ed Bentley calls from B&E. He says he found a circuit board, | ||
but does not know if it is the circuit board from the spares kit. Ed cannot | ||
remember exactly, but he seems to recall the original circuit board failed and | ||
he swapped it with the one from the spare parts kit. Ed wants to know if the | ||
serial number on the board is the same as the board shipped in the spare parts | ||
kit he bought. | ||
|
||
### Serialized Stock Consumed by a Project | ||
|
||
Explore serial numbers in the context of a project. B&E Submarines plans to upgrade 5 of their submarines with Aircraft Wireless systems. A contract is negotiated between the SCC and B&E, and the SCC initiates a Project to capture all related activity (of which the physical receiver units are only one portion). Complete radio receivers PN 10000003 are manufactured, each with its own serial number, traceable to the serialized electronics circuit board within. The completed radio receivers are sold and delivered to B&E as part of the overall project. | ||
Explore serial numbers in the context of a project. B&E Submarines plans to | ||
upgrade 5 of their submarines with Aircraft Wireless systems. A contract is | ||
negotiated between the SCC and B&E, and the SCC initiates a Project to capture | ||
all related activity (of which the physical receiver units are only one portion). | ||
Complete radio receivers PN 10000003 are manufactured, each with its own serial | ||
number, traceable to the serialized electronics circuit board within. The | ||
completed radio receivers are sold and delivered to B&E as part of the overall | ||
project. | ||
|
||
Sometime later, Ed Bentley calls from B&E. He has a circuit board in his hand | ||
again, and wants to know where the serial number came from. Ed asks if the | ||
circuit board was from one of the 5 receivers delivered as part of the upgrade | ||
project. | ||
|
||
|
||
## Startup | ||
### Import Parts from Parts&Vendors | ||
|
||
* export_current_to_csv.sh | ||
* load_current_from_csv.sh | ||
|
||
|
||
## Customization | ||
### Re-Label Existing Part Attribute UDF (User Defined Field) | ||
|
||
* ToDo | ||
|
||
Sometime later, Ed Bentley calls from B&E. He has a circuit board in his hand again, and wants to know where the serial number came from. Ed asks if the circuit board was from one of the 5 receivers delivered as part of the upgrade project. | ||
### Add New Part Attribute | ||
|
||
## Issues | ||
### Import issues (import/issues.csv) | ||
* ToDo |