Skip to content

Periodic CI

Periodic CI #100

Triggered via schedule June 19, 2023 12:37
Status Failure
Total duration 2m 13s
Artifacts

ci-cron.yaml

on: schedule
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
docs
Process completed with exit code 255.
test (3.9, 5)
Process completed with exit code 255.
test (3.11, 5)
The operation was canceled.
test (3.11, dev)
The operation was canceled.
test (3.8, dev)
The operation was canceled.
test (3.10, dev)
The operation was canceled.
test (3.8, 5)
The operation was canceled.
test (3.10, 5)
The operation was canceled.
test (3.9, dev)
The operation was canceled.