Skip to content

Pathogen repo build #26

Pathogen repo build

Pathogen repo build #26

Re-run triggered August 25, 2023 21:47
Status Success
Total duration 54s
Artifacts 1

pathogen-repo-build.yaml

on: workflow_dispatch
Fit to window
Zoom out
Zoom in

Annotations

6 errors
wait-1
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 1 minute.
wait-1
The operation was canceled.
wait-2
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 1 minute.
wait-2
The operation was canceled.
wait-3
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 1 minute.
wait-3
The operation was canceled.

Artifacts

Produced during runtime
Name Size
build-outputs Expired
1.48 KB