5 network tasks finished at network hackathon offered by Orange Digital Center and Instant Software Solutions here is description for each project.
Design & Configure Two networks for two branches for one company each branch has 40 pc with 4 vlans each vlan contain 10 pc and connected with one router .
- LAN technique and protocol used
- DHCP Server at Switch layer 3
- EtherChannel between switches layer 2 and switch layer 3
- trunk port and access port
- SVI
- Port Security
- WLAN technique and protocol used
- OSPF Routing protocol
- EIGRP Routing Protocol
- Redestribution
- HSRP
You have only 5 public ip Address and 15 pc and you want all pc's to connect with internet at same time without intteruption.
- Dynamic PAT
- DHCP server
Authentication using OSPF and keyChain
this task contain five routers, three routers at same Autonomus system and other two routers each at different autonumus system to route to external network
- BGP
- MPLS
- Load Balancing
- OSPF
- Key Chain at R2
this task is frame relay with two options (FrameRelay Map , Point To Point)