Triggered via schedule May 3, 2024 03:07
Status Failure
Total duration 1m 37s
Artifacts

rust-next.yml

on: schedule
Check latest dependencies
1m 25s
Check latest dependencies
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

13 errors
Test (ubuntu-latest, nightly)
Process completed with exit code 101.
Test (macos-latest, stable)
Process completed with exit code 101.
Test (windows-latest, beta)
The job was canceled because "macos-latest_stable" failed.
Test (windows-latest, beta)
The operation was canceled.
Test (windows-latest, stable)
The job was canceled because "macos-latest_stable" failed.
Test (windows-latest, stable)
The operation was canceled.
Test (ubuntu-latest, stable)
The job was canceled because "macos-latest_stable" failed.
Test (ubuntu-latest, stable)
The operation was canceled.
Test (ubuntu-latest, beta)
The job was canceled because "macos-latest_stable" failed.
Test (ubuntu-latest, beta)
The operation was canceled.
Test (macos-latest, beta)
The job was canceled because "macos-latest_stable" failed.
Test (macos-latest, beta)
The operation was canceled.
Check latest dependencies
Process completed with exit code 101.