Drift manager/pr #495
ci.yml
on: pull_request
black
30s
check-docs-build
32s
changelog
29s
Matrix: check-in-docker
Matrix: unittest
slack-notify
0s
Annotations
7 errors
unittest (3.11, mysql, stable)
Process completed with exit code 1.
|
unittest (3.11, postgresql, 2.0.0)
The job was canceled because "_3_11_mysql_stable" failed.
|
unittest (3.11, postgresql, 2.0.0)
The operation was canceled.
|
unittest (3.8, postgresql, stable)
The job was canceled because "_3_11_mysql_stable" failed.
|
unittest (3.8, postgresql, stable)
The operation was canceled.
|
unittest (3.11, postgresql, stable)
The job was canceled because "_3_11_mysql_stable" failed.
|
unittest (3.11, postgresql, stable)
The operation was canceled.
|