This code reproduces the figures of the preprint.
The two examples are Shaw-Pierre example and Clamped-clamped beam example
Note that the Clamped-clamped beam example takes a long time to run. The Shaw-Pierre example takes less time, but it is by no means fast. Optimisation consumes the most time, all other calculations are negligible in comparison.