Motivation

This package solves the problem of running multiple dependent actions (or tasks) in parallel.

If you're familiar with GNU Make, the following table lists somewhat comparable terms:

dagproc GNU Make
Process "make" command
pipeline Makefile
Node rule
id target name
parent id dependency

Description

Package's main entities are listed below.

Node

Node interface represents a basic building block. Each node can have zero or more dependencies (or prerequisites). Each Node have a Do method, which is executed when all of the parent nodes have completed execution (therefore, all prerequisites are met).

Simply define these three methods on your structure to use it with this package:

  • ID() string: ID should return an ID, i.e. "3". ID must be unique across all nodes.
  • ParentIDs() []string: ParentIDs should return a slice of IDs that this node depends on, i.e. ["1", "2"].
  • Do() error: Do should execute the node action and return an error. If it returns ErrIgnore, the error will be ignored, with the message in ErrIgnore (you can use the NewIgnoreError to initialise it). Any other error will lead to process termination.

Node is an equivalent of GNU Make "target".

Process

Process function executes the actions defined by the Nodes in an ordered manner.

When Process function is called with a slice of nodes, it builds a graph, in which each vertex is linked to a Node with the same index, with edges of the graph connecting dependent nodes.

Nodes that do not have a common dependency, will be executed asynchronously, if number of worker goroutines allows for that (see example).

Process is an equivalent of a running instance of GNU Make aganst a Makefile.

Example 1

The example shows how the Process would deal with the sample pipeline and in which order the Node actions will be executed.

Run parameters:

  • Number of workers: 2;
  • Node action: sleep(1 sec)
  • Pipeline:

  1. Process starts.
  2. Node 1 action is executed, prerequisite for Node 2 is satisfied.
  3. Node 2 action is executed — prerequisite for Node 3 and Node 5 is satisfied, and one of the two prerequisites for Node 4 is satisfied.
  4. We are running with two concurrent workers, Node 3 and Node 5 actions are executed at the same time. When Node 3 action is complete, all prerequisites for node 4 are satisfied, and one of the two prerequisites for Node 6 is satisfied.
  5. Node 4 action is executed, all prerequisites for Node 6 are satisfied.
  6. Node 6 action is executed.